Actions
Task #2932
open
TJ
VS
Task #2934: Detailed Design
Design and Development of Connector PCB(Modification)
Task #2932:
Design and Development of Connector PCB(Modification)
Start date:
05/01/2026
Due date:
06/01/2026 (about 2 months late)
% Done:
100%
Estimated time:
Description
Modify connector PCB considering the mech and electrical connection with IO PCB
TJ Updated by Thomas Joseph 2 months ago
- Parent task set to #2934
VS Updated by VenuMadhav S 2 months ago
- Status changed from New to In Progress
Design completed. Needs to generate the Gerber
TJ Updated by Thomas Joseph 2 months ago
- % Done changed from 0 to 90
VS Updated by VenuMadhav S 2 months ago ยท Edited
- Status changed from In Progress to Resolved
- % Done changed from 90 to 100
Design of Connector PCB completed.
Actions