Project

General

Profile

Actions

Task #2932

open
TJ VS

Task #2934: Detailed Design

Design and Development of Connector PCB(Modification)

Task #2932: Design and Development of Connector PCB(Modification)

Added by Thomas Joseph 2 months ago. Updated 2 months ago.

Status:
Resolved
Priority:
Normal
Assignee:
Start date:
05/01/2026
Due date:
06/01/2026 (about 2 months late)
% Done:

100%

Estimated time:

Description

Modify connector PCB considering the mech and electrical connection with IO PCB

TJ Updated by Thomas Joseph 2 months ago Actions #1

  • Parent task set to #2934

VS Updated by VenuMadhav S 2 months ago Actions #2

  • Status changed from New to In Progress

Design completed. Needs to generate the Gerber

TJ Updated by Thomas Joseph 2 months ago Actions #3

  • % Done changed from 0 to 90

VS Updated by VenuMadhav S 2 months ago ยท Edited Actions #4

  • Status changed from In Progress to Resolved
  • % Done changed from 90 to 100
Actions

Also available in: PDF Atom