VS VenuMadhav S
- Login: VenuMadhav
- Registered on: 31/01/2024
- Last sign in: 10/03/2026
Issues
| open | closed | Total | |
|---|---|---|---|
| Assigned issues | 75 | 2 | 77 |
| Reported issues | 12 | 0 | 12 |
Projects
| Project | Roles | Registered on |
|---|---|---|
| Chola Turbo Machinery Pvt Ltd | HW_Lead | 02/01/2026 |
| Core4 | Manager, Hardware Engr. | 05/01/2026 |
| mDAQ4-1(Mid Range mDAQ)-Pilot | Manager, Hardware Engr. | 06/01/2026 |
| mDAQ4-1(Mid Range mDAQ)-Production | Manager, Hardware Engr. | 09/01/2026 |
| mTracker(Mid Range GW)-Pilot | Manager, Hardware Engr. | 06/01/2026 |
| mTracker(Mid Range GW)-Production | Manager, Hardware Engr. | 09/01/2026 |
| Gateway 3.0 | HW_Lead | 25/02/2026 |
| Gateway V2 | Manager | 24/12/2025 |
| Gateway V2.1 | Manager | 24/12/2025 |
Activity
17/02/2026
- VS 11:32 AM mTracker(Mid Range GW)-Production Task #3164: PCB Design
- https://elpisit-my.sharepoint.com/:u:/g/personal/satish_sl_elpisitsolutions_com/IQB2Bey1QOAmQqPvCE4tc0Q3AYajYUPbMRwrmLzCZWcnEjE?e=dL5GKF
06/02/2026
- VS 03:38 PM mTracker(Mid Range GW)-Production Task #3164: PCB Design
- https://elpisit-my.sharepoint.com/:u:/g/personal/satish_sl_elpisitsolutions_com/IQBkF3KrFibuRrDO8zS_kA0bAY3OGyz4Je1RELxlA-UrDUM?e=t4zxtB
29/01/2026
- VS 04:50 AM mTracker(Mid Range GW)-Pilot Task #2933: Design of Enclosure Cutouts
- https://elpisit-my.sharepoint.com/:u:/g/personal/satish_sl_elpisitsolutions_com/IQAARDBjtR0ETqFPNZss_vv0ASqApsiV6jKOXXnHDfVbysw?e=bwdiTt
Design Stepfile
25/01/2026
- VS 01:24 AM mDAQ4-1(Mid Range mDAQ)-Pilot Task #3157: GW2.0 PCB Testing
- We received the GW V2.0 assembled PCB's from uV.
Started the testing. We identified the components wrong placement at the I/P protection section and sub sequent sections.
Due to that it testing got delayed.
23/01/2026
- VS 10:14 AM mTracker(Mid Range GW)-Pilot Task #3232 (Resolved): Rework Sheet
- https://elpisit-my.sharepoint.com/:x:/g/personal/satish_sl_elpisitsolutions_com/IQAxYIVVNhMpRrGEVi1yzmiTARuMVsDtVURJAZtOiMzEHRQ?e=nvhgIk
Rework sheet updated - VS 02:35 AM mDAQ4-1(Mid Range mDAQ)-Pilot Task #3000: Assembly Manual (Documentation)
- PLCIO integration Assembly completed and document needs to be prepare.
- VS 02:35 AM mDAQ4-1(Mid Range mDAQ)-Pilot Task #3000 (In Progress): Assembly Manual (Documentation)
- VS 02:34 AM mTracker(Mid Range GW)-Pilot Task #3047 (In Progress): Review/Update of GW2.0 Test Plan and Procedure
- Pls refer the TPP.
https://elpisit-my.sharepoint.com/:x:/g/personal/satish_sl_elpisitsolutions_com/IQDsXzRdE9FqQrbdlyXI_cYZAep7doTl9zUdInK22y74CHA?e=9owtJj
22/01/2026
- VS 03:31 PM mTracker(Mid Range GW)-Production Task #3163: Schematic Design
- https://elpisit-my.sharepoint.com/:u:/g/personal/satish_sl_elpisitsolutions_com/IQAEuoXpF0gpSpNnMW_XGwgBATYoZf1mJFcUr4f-XUExl14?e=4ee4z5--
RS485- Added- sercom7-PD08-TX
PD09-RX
SPI Lan circuit deleted.
... - VS 03:31 PM mTracker(Mid Range GW)-Production 4:00 hours (Task #3163 (In Progress): Schematic Design)
- RS-485 schematic design added