Actions
Task #2966
openTask #2934: Detailed Design
Wiring Diagram
Task #2966:
Wiring Diagram
Start date:
05/01/2026
Due date:
16/01/2026 (about 4 months late)
% Done:
100%
Estimated time:
Spent time:
Updated by Thomas Joseph 4 months ago
In orcad, use the BD of GW2.0, add LED PCB and IO-USB as a block and show interconnections.
For stacking, use block arrows
Updated by Thomas Joseph 4 months ago
- Status changed from New to In Progress
- % Done changed from 0 to 30
Updated by Thomas Joseph 4 months ago
- % Done changed from 30 to 50
Updated by Thomas Joseph 4 months ago
- % Done changed from 50 to 80
Orcad Design updated in http://5.161.106.25:3000/issues/2965
Make wiring diagram by marking the connector/pin details (for connections other than direct stacking)
Updated by Thomas Joseph 4 months ago
- Due date changed from 05/01/2026 to 16/01/2026
Due date extended as this is for documentation only. The connection details are known
Updated by Thomas Joseph 4 months ago
- Related to Task #2960: Wiring Diagram added
Updated by Thomas Joseph 4 months ago
- % Done changed from 80 to 90
Updated by VenuMadhav S 3 months ago
- % Done changed from 90 to 100
Updated by Thomas Joseph 3 months ago
VenuMadhav S wrote in #note-8:
Updated document.
Include rework sheet also (use of SPI-WiFi connector in place of SPI-LAN)
Updated by Thomas Joseph 3 months ago
- % Done changed from 100 to 90
Updated by Thomas Joseph 3 months ago
- % Done changed from 90 to 100