Project

General

Profile

Actions

Task #2988

closed
TJ VS

Task #2985: Detailed Design

Design and Development of GW IF PCB

Task #2988: Design and Development of GW IF PCB

Added by Thomas Joseph 2 months ago. Updated about 2 months ago.

Status:
Closed
Priority:
Normal
Assignee:
Start date:
07/01/2026
Due date:
20/01/2026
% Done:

20%

Estimated time:

Description

this is to interface b/w GW2.0 controller PCB, 4G PCB and PLCIO PCBs

VS Updated by VenuMadhav S about 2 months ago Actions #1

TJ Updated by Thomas Joseph about 2 months ago Actions #2

  • Due date changed from 10/01/2026 to 20/01/2026
  • Status changed from New to Analysis Started

TJ Updated by Thomas Joseph about 2 months ago Actions #3

  • Status changed from Analysis Started to Closed

As per the new plan, the interface PCB is not required.
Refer => http://5.161.106.25:3000/issues/2986#note-5

Task is no longer required. Hence closed

Actions

Also available in: PDF Atom