Task #3222
openProject Planning and Review
Description
For time-sheet reporting purpose ONLY based on email from HR dated 08/01/2026 Subject: Mandatory Submission of Weekly Timesheet
Updated by Thomas Joseph 7 months ago
- Due date changed from 16/02/2026 to 07/03/2026
Updated by Thomas Joseph 7 months ago
- % Done changed from 0 to 30
Updated by Thomas Joseph 7 months ago
Teams meeting : Discussion on following Projects/Products
(SV, VK, TJ)
N58 Open CPU
- HW - PCB Design , Mechanical
- SW -
- Dhilip for PCB design
- Buy open CPU module and start s/w development
E54 Platform
- Core4 RTU is the super set - Controller PCB, IO PCB, PLCIO PCB
Jubilant
-SW
VAS
List functions and assign resources
Mohan and Devipriyaa (rpm, sync-in, sync-out, delay in throughput, FFT in device)
Yoganand
TPMS - Very high priority
Mohan
CABS
Linux - EIDOS
Updated by Thomas Joseph 2 months ago
- Due date changed from 07/03/2026 to 31/07/2026
- % Done changed from 30 to 50
Teams meeting(@Venu Krishnamurthy & team members)
Virajpet Delivery - 4 mTrackerLite and 2 mDAQ RTU (total 6 Nos)
27/6 2pm update
-
Enclsosures (Dhilip has already collected with Screen print and cut outs) - Done
-
Connector PCBs received today - Done
-
PLCIO pcb testing - Resmi,
first board AI completed, DI/DO testing pending.
1st board testing completed, will be handed over to Malli
2nd board testing to be done and handed over to Malli. -
Diagnostic tests SW - malli (to help Resmi test the PLCIO boards) -
Stress/Load testing on 4G, LAN and SDcard testing
SW binary - Malli
HW setup - Resmi/Sumanth
Testing - Chethan
No issues detected for the above tests.
No current measurements done, Resmi will handover DMM after testing PLCIO board -
mTracker lite enclosure assembly - surendra.
4 enclosures completed, ready for system testing. Chethan/Malli to get started
1 SAME54 controller to be replaced, berg connectors to be mounted. -
mTrackerLite System testing - Chethan, Pls keep submitting the test reports
Chethan to share the current test reports -
Connector PCB Components -
received all connectors except right angle connector. expected today. -
Connector PCBs assembly - Surendra
2 boards to be assembled. have 1 backup, waiting for the right angle connector. -
mDAQ RTU Enclsoure assembly mDAQ RTU - Surendra/Dhilip
Surendra to assemble and keep passing on to Malli/Chethan to start testing the device. -
mDAQ RTU System testing - Chethan
full system test to be planned on Sunday.
SW/HW fixes - Malli and Resmi -
GPS Led not functional. GPS not enabled in SW. Malli to confirm. Plan for next release