Task #3520

open

Mechanical Fabrication

Task #3520: Mechanical Fabrication

Added by Thomas Joseph 5 months ago. Updated 3 months ago.

Status:
In Progress
Priority:
Normal
Assignee:
Target version:
Start date:
20/04/2026
Due date:
09/06/2026 (about 3 months late)
% Done:

100%

Estimated time:
Spent time:

Updated by Thomas Joseph 5 months ago Actions #1

  • Due date changed from 27/03/2026 to 27/04/2026
  • Start date changed from 20/03/2026 to 20/04/2026

Updated by Thomas Joseph 3 months ago ยท Edited Actions #2

Inform Venu sir about V300 design
Initiate with Deeksha

Updated by Thomas Joseph 3 months ago Actions #3

  • Due date changed from 27/04/2026 to 09/06/2026

Due date changed from 20/04/2026 to 03/06/2026

Due date extended based on http://5.161.106.25:3000/issues/3662#note-1

  1. use v300 carry case
  2. Top panel fabrication and screen printing
  3. V300 frame fabrication including bottom plate
  4. bottom plate clamp fabrication
  5. cable assembly

Updated by Thomas Joseph 3 months ago Actions #4

  • Status changed from New to In Progress
  • % Done changed from 0 to 20

Meeting discussion (VM, DT, BSN)

@Dhanasekar T

-Check waveshare display, depth, availability, order if we get in this week
-followup Top plate design with Shiva
-update bottom plate design
---use actual size of all components, boxes
---add cable entry for all, with bending radius, mini pc fins
---fix mini pc direction
---consider an exhaust fan
---ISP box add in design
-Decide clamp after completing the bottom plate design

Updated by Thomas Joseph 3 months ago Actions #5

9/06/2026
Clamp fab completed

Updated by Thomas Joseph 3 months ago Actions #6

  • % Done changed from 20 to 100

18/06/2026
Top plate fabrication completed and received

All fabrication completed

Actions