Task #3707

open

Post Delivery bug fixing

Task #3707: Post Delivery bug fixing

Added by Thomas Joseph 2 months ago. Updated 2 months ago.

Status:
In Progress
Priority:
Normal
Target version:
Start date:
24/06/2026
Due date:
29/06/2026 (about 2 months late)
% Done:

90%

Estimated time:
Spent time:

Files

OBSERVATIONS_ELPIS_25-6.xlsx (12 KB) OBSERVATIONS_ELPIS_25-6.xlsx Jagatheswaran J, 26/06/2026 09:48 AM

Updated by Thomas Joseph 2 months ago Actions #1

Issues and recommended testing and fixes as per discussion on 24/06/2026 => https://elpisit.sharepoint.com/:w:/s/EmbeddedFiles/IQCa6BDJZJ74TICP5lPrmxf7AWE58R23QD3WCPulUmjl4AM?e=IAoFsn

Updated by Thomas Joseph 2 months ago Actions #2

  • Start date changed from 25/06/2026 to 24/06/2026

Updated by Jagatheswaran J 2 months ago Actions #3

Updated by Thomas Joseph 2 months ago Actions #4

Based on test conducted on 25/06/2026 6.00pm to 26/06/2026

Summary and action items => https://elpisit.sharepoint.com/:w:/s/EmbeddedFiles/IQAIwsGBcp2AQoHojAUkIcayAblo7K3Ecz1mrBRfbLAKnz4?e=QniMWd

Fix by Sunday and Monday, plan delivery on Wednesday 01/07/2026

Updated by Thomas Joseph 2 months ago ยท Edited Actions #5

Retest conducted for heating issue. Identified Display BL LDO 1117(SOT223).

Checked USB voltage found 5.0V

issue related to Touch hanging

Updated by Thomas Joseph 2 months ago Actions #6

Display LM1117 (U3 ) is heating. This is a linear regulator with min 1.2V dropout

measure input current.
plan for distribute power dissipation using two regulator or diode regulator

Updated by Thomas Joseph 2 months ago Actions #7

1/7/2026
Discussion, Testing guidelines on resolution for Display heating
decided to order Waveshare display

Updated by Thomas Joseph 2 months ago Actions #8

  • % Done changed from 60 to 70

Updated by Thomas Joseph 2 months ago Actions #9

Windows optimised by uninstalling unnecessary applications

Updated by Thomas Joseph 2 months ago Actions #10

UPS led circuit testing => working
Review of display mounting

Updated by Thomas Joseph 2 months ago Actions #11

  • % Done changed from 70 to 90

email for BSH for @Venu Krishnamurthy to review

Assembly to complete as follows

B.Surendra Naik: Shorten BNC, Capture UPS LED waveform
Jagatheswaran.J: Test miniPC with Display , change display orientation
B.Surendra Naik: Display mounting with alignment, complete assembly (please share photos of bottom plate and top plate, from all sides, and also after fixing top plate
Jagatheswaran.J: Final integrated testing, start by 2.00pm

Final testing => https://elpisit.sharepoint.com/:w:/s/EmbeddedFiles/IQDb9VXKu8GiTId0nAxVtb9PAZx7JLnkTGnUATQQXW4btI8?e=nQriZx

Updated by Thomas Joseph 2 months ago Actions #12

Review meeting at 4:00

All pending issues fixed.

Complete assembly => @Dhanasekar T

Splash screen in ELPRO mini PC => @Venu Krishnamurthy
Host name insted of static IP => @Shiva Leela
User manual update => @Prakash M

System testing => @Jagatheswaran J

Revioew meeting tomo 3.30pm