General

Profile

Gowri G

  • Login: Gowri
  • Registered on: 31/01/2024
  • Last sign in: 03/04/2026

Issues

open closed Total
Assigned issues 5 1 6
Reported issues 0 0 0

Projects

Project Roles Registered on
Gateway 3.0 Developer 09/03/2026
mDAQ4-1(Mid Range mDAQ)-Pilot Developer 11/02/2026
mTracker(Mid Range GW)-Pilot Developer 11/02/2026
Gateway V2 Developer 24/12/2025

Activity

03/04/2026

12:25 PM Gateway 3.0 8:00 hours (Task #3451 (New): Onsite Demo and installation)
Demo at Customer Place KT telematics Gowri G
12:25 PM Gateway 3.0 Task #3451: Onsite Demo and installation
On 30/03/2026 The demo was done on customer site at KT telematics
1.Demonstrated the RS485 and rs232 data to the customer
2.For RS23 data the weighing scale data is showed on the Eremos dashboard through our tracker v3 device 4g comm...
Gowri G

30/03/2026

07:31 AM Gateway 3.0 8:00 hours (Task #3451 (New): Onsite Demo and installation)
Onsite Demo -KT telematics Gowri G
07:31 AM Gateway 3.0 Task #3451: Onsite Demo and installation
Conducted the demo on Customer place at KT telematics,Sangagiri
Summary:
HATSUN dairys,Tharamangalam,salem - Demo - Tracker V3 Device with RS232 and RS485- 16/03/2026
They are using Promethane
Demo was showed to the customer for RS...
Gowri G

23/03/2026

06:54 AM Gateway 3.0 8:00 hours (Task #3354 (Resolved): Phase 0B)
Client Demo - KT Telematics,Sangagiri Gowri G
06:54 AM Gateway 3.0 Task #3354: Phase 0B
Conducted the demo on Customer place at KT telematics,Sangagiri
Summary:
HATSUN dairys,Tharamangalam,salem - Demo - Tracker V3 Device with RS232 and RS485- 16/03/2026
They are using Promethane
Demo was showed to the customer for RS...
Gowri G
06:35 AM Gateway 3.0 8:00 hours (Task #3354 (Resolved): Phase 0B)
Raised the Query to Promethean Power systems for 8relay Board Manual - Address Mapping Gowri G

18/03/2026

06:57 AM Gateway 3.0 Task #3359 (Closed): Data posting over 4G
Testing with 4g was done
Verified the data posting ,every 23 secs once it is posting the data,both rs485 and rs232 data was posting in the cloud server.
Gowri G
06:57 AM Gateway 3.0 8:00 hours (Task #3359 (Closed): Data posting over 4G)
Developement of Tracker V3 RS485 and RS232 with 4G Gowri G
06:55 AM Gateway 3.0 8:00 hours (Task #3354 (Resolved): Phase 0B)
Demo on the customer place Gowri G

Also available in: Atom