General

Profile

BM Bhavani M

  • Login: Bhavani
  • Registered on: 19/06/2024
  • Last sign in: 27/02/2026

Issues

open closed Total
Assigned issues 24 0 24
Reported issues 0 0 0

Projects

Project Roles Registered on
Chola Turbo Machinery Pvt Ltd QA 02/01/2026
mDAQ4-1(Mid Range mDAQ)-Pilot Hardware Engr. 21/01/2026
mTracker(Mid Range GW)-Production Hardware Engr. 18/01/2026
Gateway 3.0 Hardware Engr. 25/02/2026
Gateway V2 Hardware Engr. 24/12/2025
Gateway V2.1 Hardware Engr. 24/12/2025
SAMA5D4 Hardware Development Developer 23/12/2025
TPMS 2-Wheeler Hardware Engr., QA 23/12/2025
TPMS 4 Wheeler Hardware Engr., QA 29/12/2025

Activity

27/02/2026

BM 07:13 AM mDAQ4-1(Mid Range mDAQ)-Pilot 8:00 hours (Task #3157 (In Progress): GW2.0 PCB Testing)
PCB testing Bhavani M
BM 07:13 AM mDAQ4-1(Mid Range mDAQ)-Pilot Task #3157: GW2.0 PCB Testing
https://elpisit-my.sharepoint.com/:f:/g/personal/satish_sl_elpisitsolutions_com/IgD2k3Iq_6lZRLPu9Un49ExSAQOYLbFrNiJwm7Dr9yegOvs?e=dXgP7f-----
Test reports
260701
260702
260703
U38,SD card holder components are shortage for 260...
Bhavani M

20/02/2026

BM 02:18 PM mDAQ4-1(Mid Range mDAQ)-Pilot 8:00 hours (Task #3157 (In Progress): GW2.0 PCB Testing)
PCB Testing Bhavani M
BM 02:18 PM mDAQ4-1(Mid Range mDAQ)-Pilot Task #3157: GW2.0 PCB Testing
Rework and Power circuit Electrical testing for MCU Boards.
260701
260702
260703
https://elpisit-my.sharepoint.com/:f:/g/personal/satish_sl_elpisitsolutions_com/IgAKJtm7AhMhRLZKNOfwaEVGAagFcPPIQJQT32KFTPTgMdw?e=QzOjPt-----TAA report
Bhavani M
BM 02:11 PM mDAQ4-1(Mid Range mDAQ)-Pilot 4:00 hours (Task #3157 (In Progress): GW2.0 PCB Testing)
Visual Inspection Bhavani M
BM 02:11 PM mDAQ4-1(Mid Range mDAQ)-Pilot Task #3157: GW2.0 PCB Testing
Visual Inspection for Gateway_v2.0 Boards.
260701
260702
260703
260704
260705
260706
https://elpisit-my.sharepoint.com/:f:/g/personal/satish_sl_elpisitsolutions_com/IgBf8PQ-dWzGSIn_bKJ5mWAwAf_Rsyc120XWt_nBAUrGEVo?e=mArdHq.--------vi...
Bhavani M
BM 01:55 PM mTracker(Mid Range GW)-Production 1:00 hour (Task #3248 (In Progress): PCB Design)
Ref des sorting Bhavani M
BM 01:55 PM mTracker(Mid Range GW)-Production Task #3248: PCB Design
https://elpisit-my.sharepoint.com/:u:/g/personal/satish_sl_elpisitsolutions_com/IQAHfVjCXq8mR6iy3YEdboKhAZeI6rS_bXzm4kFqnyr663M?e=GQqlhL.....
rename txt File created, Ref des updated in PCB layout.
GW_V2_2_CON_20260216.brd----Sorted Re...
Bhavani M

17/02/2026

BM 04:20 AM Gateway V2.1 Task #3062 (Resolved): Connector PCB Routing
Bhavani M

14/02/2026

BM 01:29 PM mTracker(Mid Range GW)-Production Task #3248: PCB Design
https://elpisit-my.sharepoint.com/:u:/g/personal/satish_sl_elpisitsolutions_com/IQB1A7FJoDCVQoiggLwQAiU3AfCUXWC7AT2aRmRxXK4qu5M?e=0aaPaA
Connector PCB Routing was completed. Thomas Sir, please Review.
Bhavani M

Also available in: Atom