BM Bhavani M
- Login: Bhavani
- Registered on: 19/06/2024
- Last sign in: 27/02/2026
Issues
| open | closed | Total | |
|---|---|---|---|
| Assigned issues | 24 | 0 | 24 |
| Reported issues | 0 | 0 | 0 |
Projects
| Project | Roles | Registered on |
|---|---|---|
| Chola Turbo Machinery Pvt Ltd | QA | 02/01/2026 |
| mDAQ4-1(Mid Range mDAQ)-Pilot | Hardware Engr. | 21/01/2026 |
| mTracker(Mid Range GW)-Production | Hardware Engr. | 18/01/2026 |
| Gateway 3.0 | Hardware Engr. | 25/02/2026 |
| Gateway V2 | Hardware Engr. | 24/12/2025 |
| Gateway V2.1 | Hardware Engr. | 24/12/2025 |
| SAMA5D4 Hardware Development | Developer | 23/12/2025 |
| TPMS 2-Wheeler | Hardware Engr., QA | 23/12/2025 |
| TPMS 4 Wheeler | Hardware Engr., QA | 29/12/2025 |
Activity
27/02/2026
- BM 07:13 AM mDAQ4-1(Mid Range mDAQ)-Pilot 8:00 hours (Task #3157 (In Progress): GW2.0 PCB Testing)
- PCB testing
- BM 07:13 AM mDAQ4-1(Mid Range mDAQ)-Pilot Task #3157: GW2.0 PCB Testing
- https://elpisit-my.sharepoint.com/:f:/g/personal/satish_sl_elpisitsolutions_com/IgD2k3Iq_6lZRLPu9Un49ExSAQOYLbFrNiJwm7Dr9yegOvs?e=dXgP7f-----
Test reports
260701
260702
260703
U38,SD card holder components are shortage for 260...
20/02/2026
- BM 02:18 PM mDAQ4-1(Mid Range mDAQ)-Pilot 8:00 hours (Task #3157 (In Progress): GW2.0 PCB Testing)
- PCB Testing
- BM 02:18 PM mDAQ4-1(Mid Range mDAQ)-Pilot Task #3157: GW2.0 PCB Testing
- Rework and Power circuit Electrical testing for MCU Boards.
260701
260702
260703
https://elpisit-my.sharepoint.com/:f:/g/personal/satish_sl_elpisitsolutions_com/IgAKJtm7AhMhRLZKNOfwaEVGAagFcPPIQJQT32KFTPTgMdw?e=QzOjPt-----TAA report - BM 02:11 PM mDAQ4-1(Mid Range mDAQ)-Pilot 4:00 hours (Task #3157 (In Progress): GW2.0 PCB Testing)
- Visual Inspection
- BM 02:11 PM mDAQ4-1(Mid Range mDAQ)-Pilot Task #3157: GW2.0 PCB Testing
- Visual Inspection for Gateway_v2.0 Boards.
260701
260702
260703
260704
260705
260706
https://elpisit-my.sharepoint.com/:f:/g/personal/satish_sl_elpisitsolutions_com/IgBf8PQ-dWzGSIn_bKJ5mWAwAf_Rsyc120XWt_nBAUrGEVo?e=mArdHq.--------vi... - BM 01:55 PM mTracker(Mid Range GW)-Production 1:00 hour (Task #3248 (In Progress): PCB Design)
- Ref des sorting
- BM 01:55 PM mTracker(Mid Range GW)-Production Task #3248: PCB Design
- https://elpisit-my.sharepoint.com/:u:/g/personal/satish_sl_elpisitsolutions_com/IQAHfVjCXq8mR6iy3YEdboKhAZeI6rS_bXzm4kFqnyr663M?e=GQqlhL.....
rename txt File created, Ref des updated in PCB layout.
GW_V2_2_CON_20260216.brd----Sorted Re...
17/02/2026
- BM 04:20 AM Gateway V2.1 Task #3062 (Resolved): Connector PCB Routing
14/02/2026
- BM 01:29 PM mTracker(Mid Range GW)-Production Task #3248: PCB Design
- https://elpisit-my.sharepoint.com/:u:/g/personal/satish_sl_elpisitsolutions_com/IQB1A7FJoDCVQoiggLwQAiU3AfCUXWC7AT2aRmRxXK4qu5M?e=0aaPaA
Connector PCB Routing was completed. Thomas Sir, please Review.