Project

General

Profile

Actions

Task #2893

open

Detailed Design

Task #2893: Detailed Design

Added by Sunder Venugopal 4 months ago. Updated about 1 month ago.

Status:
Resolved
Priority:
Normal
Assignee:
Target version:
-
Start date:
11/11/2025
Due date:
07/01/2026 (about 4 months late)
% Done:

100%

Estimated time:
Spent time:

Description

Schematic Design
PCB Design
PCB Fabrication


Related issues 2 (2 open0 closed)

Precedes TPMS 4 Wheeler - Task #2897: PCB Design ReviewResolvedSumanth D08/01/202612/01/2026

Actions
Precedes TPMS 4 Wheeler - Task #2903: Design Review and ApprovalResolvedSumanth D08/01/202612/01/2026

Actions

Updated by Sunder Venugopal 4 months ago Actions #1

  • Due date changed from 19/12/2025 to 07/01/2026

Updated by Sumanth D 4 months ago Actions #2

  • Assignee changed from Sumanth D to Resmi K.V

PCB Design

Updated by Resmi K.V 4 months ago Actions #3

Updated the 4W design .

  1. All DRC cleared
  2. Pogo pins placement arranged with 2.54mm pitch
  3. 4W DXF created and shared to Thomas sir to get reviewed from the RF consultant.
    4W updated design link: https://elpisit-my.sharepoint.com/:f:/g/personal/satish_sl_elpisitsolutions_com/IgBeDAYPkLZZS6FOKik4FZLiAT4gEhAHilplCQvJLKIeikk?e=n7Eexv
    DXF for 4W: https://elpisit-my.sharepoint.com/:f:/g/personal/satish_sl_elpisitsolutions_com/IgAhdRNQ-bFvT57KiJsE24DbAeoos6tK8a9cBOU6x1PuVeM?e=hrQYLG

Updated by Sumanth D 3 months ago · Edited Actions #4

  • Status changed from In Progress to Resolved
  • Assignee changed from Resmi K.V to Sumanth D
  • % Done changed from 70 to 100

Updated by Resmi K.V 3 months ago · Edited Actions #6

  • Status changed from Resolved to In Progress
  • Assignee changed from Sumanth D to Resmi K.V
  • % Done changed from 100 to 90

As per the given suggestion from the RF consultant, added the additional capacitor in schematic and placed in the layout with minimal disturbance to surrounding components.

updated DSN folder: https://elpisit-my.sharepoint.com/:u:/g/personal/satish_sl_elpisitsolutions_com/IQBweri-nAlMRZlX7fs21KgVAblGdd2Lm0sNtXYeGYPBKJk?e=bUbMgx

PCB file name:TPMS_PROD_4Wheeler_20260205.brd

DXF folder: https://elpisit-my.sharepoint.com/:u:/g/personal/satish_sl_elpisitsolutions_com/IQDsRi7aKi9rRKHy4rv_6_8VAQu3_egRHuGytLEtH7-uieM?e=fzFldN

Updated by Resmi K.V 3 months ago Actions #8

updated the last uploaded design(mentioned in #2893 note5) and uploaded in onedrive. DXF files created and kept in the same folder.

DSN folder and DXF folder link: https://elpisit-my.sharepoint.com/:u:/g/personal/satish_sl_elpisitsolutions_com/IQDxwXEh0MB0R67jKYNKG-19AYPjnPaIQ-UzibPsMDGJLDc?e=w0GViP

board file name : TPMS_PROD_4Wheeler_20260210.brd
DXF folder name : DXF_4W_20260210.rar (DXF_4W_1)(both kept inside the design folder)

Updated by Resmi K.V about 2 months ago Actions #9

Updated SSB,SST and created the panel for 4W. need to review by Sumanth and Thomas sir.

updated design uploaded in onedrive: https://elpisit-my.sharepoint.com/:u:/g/personal/satish_sl_elpisitsolutions_com/IQA7LrVpxnA0Q74mFc6GOz20AcbTUnQm2jL3xJHFVKW7DIs?e=n5Pu4W

Updated by Thomas Joseph about 2 months ago · Edited Actions #10

  1. keep only one dsn file in the design folder
  2. schematic revision history not updated in .dsn(many times reviewed by consultant)
  3. .brd => create views ( like V_Top: sst, pad, via) and analyse
  4. SS at pcb edge, pad, via to be avoided, SS under small smd components to be avoided
  5. create ASB, AST also
  6. PCB Name, version , company logo need on SST / SSB.
  7. panel => make break-off tab holes symmetric and close to board , otherwise some protrusion will happen after breaking, require filing to fit inside enclosure

Update these, create panel and send Gerber for fab

Updated by Resmi K.V about 2 months ago · Edited Actions #11

As per the given suggestions from Thomas sir, updated the board file and uploaded in onedrive.
Logo need to be added. The size of the logo is difficult to accommodate in 4Wheeler PCB so the size to be reduced. all the views has been created. AST and ASB also created for the board and panel.
dsn folder: https://elpisit-my.sharepoint.com/:u:/g/personal/satish_sl_elpisitsolutions_com/IQC3ozxb8ynjRIyUboLYptZXAWSxIlDbZxMRZNGXy2m9574?e=1BVMrf

Updated by Resmi K.V about 2 months ago · Edited Actions #12

Updated by Resmi K.V about 1 month ago Actions #13

  • Status changed from In Progress to Resolved
  • % Done changed from 90 to 100
Actions

Also available in: PDF Atom