RK Resmi K.V

  • Login: Resmi
  • Registered on: 31/01/2024
  • Last sign in: 10/03/2026

Issues

open closed Total
Assigned issues 7 0 7
Reported issues 0 0 0

Projects

Project Roles Registered on
Core4 HW_Lead 19/01/2026
mDAQ4-1(Mid Range mDAQ)-Pilot Hardware Engr. 13/01/2026
mDAQ4-1(Mid Range mDAQ)-Production HW_Lead 19/01/2026
mTracker(Mid Range GW)-Pilot HW_Lead 19/01/2026
mTracker(Mid Range GW)-Production HW_Lead 19/01/2026
Gateway 3.0 Hardware Engr. 25/02/2026
SAMA5D4 Hardware Development Developer 23/12/2025
TPMS 2-Wheeler Developer 23/12/2025
TPMS 4 Wheeler Developer 29/12/2025

Activity

10/03/2026

RK 12:32 PM TPMS 4 Wheeler 3:00 hours (Task #2893 (In Progress): Detailed Design)
PCB design Resmi K.V
RK 12:31 PM TPMS 4 Wheeler Task #2893: Detailed Design
Updated SSB,SST and created the panel for 4W. need to review by Sumanth and Thomas sir.
updated design uploaded in onedrive: https://elpisit-my.sharepoint.com/:u:/g/personal/satish_sl_elpisitsolutions_com/IQA7LrVpxnA0Q74mFc6GOz20AcbTU...
Resmi K.V

05/03/2026

RK 12:37 PM mDAQ4-1(Mid Range mDAQ)-Production 8:00 hours (Task #3191 (In Progress): PCB Design)
PCB design Resmi K.V
RK 12:24 PM mDAQ4-1(Mid Range mDAQ)-Production Task #3191: PCB Design
Updated the board file (smoothening of traces and GND plane extended). please review this latest board file which is uploaded in onedrive.
https://elpisit-my.sharepoint.com/:u:/g/personal/satish_sl_elpisitsolutions_com/IQAxeTsjlfYdToa...
Resmi K.V

03/03/2026

RK 11:19 AM mDAQ4-1(Mid Range mDAQ)-Production 6:00 hours (Task #3191 (In Progress): PCB Design)
PCB design Resmi K.V
RK 11:19 AM mDAQ4-1(Mid Range mDAQ)-Production Task #3191: PCB Design
Routing completed. need to be discussed with Thomas sir. GND plane to be created for AI,DI and DO.
https://elpisit-my.sharepoint.com/:u:/g/personal/satish_sl_elpisitsolutions_com/IQB2rlrAbqQHSJJD-Dfu_IhLAeaijft6fn91TBIm5Q4545Q?e=vCPh18
Resmi K.V

02/03/2026

RK 01:21 PM mDAQ4-1(Mid Range mDAQ)-Production 8:00 hours (Task #3191 (In Progress): PCB Design)
PCB design Resmi K.V
RK 01:21 PM mDAQ4-1(Mid Range mDAQ)-Production Task #3191: PCB Design
Routing is in progress. ADC inputs only pending.Ground planes to be discussed.
Updated design uploaded in onedrive.
https://elpisit-my.sharepoint.com/:u:/g/personal/satish_sl_elpisitsolutions_com/IQAFP53aw7DVQZ2CN769xhP-AdLjqLlA5Dy...
Resmi K.V

27/02/2026

RK 01:56 PM mDAQ4-1(Mid Range mDAQ)-Production 8:00 hours (Task #3191 (In Progress): PCB Design)
PCB design Resmi K.V
RK 01:56 PM mDAQ4-1(Mid Range mDAQ)-Production Task #3191: PCB Design
PCB routing is in progress. Gnd Plane to be discussed with thomas sir.
Updated design uploaded in onedrive.
https://elpisit-my.sharepoint.com/:u:/g/personal/satish_sl_elpisitsolutions_com/IQCEj3jCUe_wS4lCTlGiNN5zAa13Rh3HOtX7F5vSi4tD4...
Resmi K.V