Task #2915
openTask #2941: Detailed Design
Task #3053: GUI Design and Development
EREMOS Development
Description
OEE Customisation Dev
SV Updated by Sunder Venugopal 2 months ago
- Precedes Task #2917: System Test Results and Reports added
TJ Updated by Thomas Joseph 2 months ago
- Parent task set to #2941
TJ Updated by Thomas Joseph 2 months ago
SV Updated by Sunder Venugopal 2 months ago
- Due date changed from 09/01/2026 to 25/12/2025
- Start date changed from 02/01/2026 to 18/12/2025
- Follows Task #2957: Customer Requirements Finalisation added
VS Updated by VenuMadhav S 2 months ago
- Due date changed from 25/12/2025 to 09/01/2026
- Start date changed from 18/12/2025 to 02/01/2026
E-Remos Dashboard has to be ready with all parameters as per the customer requirement
1. Wireframes shared by chola(Refer Email).
2. GatewayV2.0 Device Integration with E-Remos.
TJ Updated by Thomas Joseph 2 months ago
- Parent task changed from #2941 to #3053
VS Updated by VenuMadhav S about 2 months ago
Sunder Sir, Has to re assign to Neha.
SV Updated by Sunder Venugopal about 2 months ago
- Due date changed from 09/01/2026 to 21/01/2026
- Start date changed from 02/01/2026 to 14/01/2026
SV Updated by Sunder Venugopal about 2 months ago
- Due date changed from 21/01/2026 to 25/12/2025
- Start date changed from 14/01/2026 to 18/12/2025
TJ Updated by Thomas Joseph about 2 months ago
- Assignee changed from Sudhakar Chakravarthi to Neha K
Assigned to Neha
VS Updated by VenuMadhav S about 2 months ago · Edited
- % Done changed from 0 to 50
1. Neha: Due date has to update by EOD. Neha wants to discuss with Frontend team.
2. E-REMOS Screenshots has to share. which includes(Parameters, Trends, email reports selection), Discuss with front end and date has to update by EOD.
TJ Updated by Thomas Joseph about 2 months ago · Edited
- Due date changed from 25/12/2025 to 16/01/2026
- Status changed from Analysis Started to In Progress
- Start date changed from 18/12/2025 to 02/01/2026
14/01/2026
Frontend work is estimated to take 5 working days
Backend tasks are expected to be completed by Monday (first half); however, I will try to complete it by Friday EOD.
If a time-interval selection is required for the report configuration UI, it may take an additional 1–2 days, which would extend the timeline.
Due date extended to 16/01/2026 based on work progress
TJ Updated by Thomas Joseph about 2 months ago
1. VV/Samee to share the screenshots of trends graph, dhashboard
TJ Updated by Thomas Joseph about 2 months ago
TJ Updated by Thomas Joseph about 2 months ago
Comments from @Sunder Venugopal over Teams
1. The parameter values 0, need some standard values
2. The grouping to be implemented as discussed with App team Samee/Neha
3. Trend graphs needs some values to depict a meaning for the customer to understand
4. Section 5.1 incomplete . need to show all the groupings in separate windows
5. Section 5.2 incomplete. All trend graphs per the requirements needs to be shown. Show with dummy trends/ simulated values
6. Section 8. pdf is a blank document.
7. The customer specifically wanted multi parameter trend graph , this is missing
TJ Updated by Thomas Joseph about 2 months ago
Dashboard - Screens and formats => https://elpisit-my.sharepoint.com/:b:/g/personal/satish_sl_elpisitsolutions_com/IQC5I5aC4i2bTo8aQ4AdfM_6Aa5mzyk8oAuNiZ_HtkF22Q8?e=lNOHgc
Shared with customer through email:
From: Sunder Venugopal <Sunder.v@elpisitsolutions.com>
Sent: Wednesday, January 21, 2026 4:02 PM
To: METHESH <project.electrical@cholaturbo.com>
Subject: Chola Customer Screen (Subject Modified )
TJ Updated by Thomas Joseph about 1 month ago
- Due date changed from 16/01/2026 to 26/01/2026
- % Done changed from 50 to 80
Due date extended
Demo conducted on 24th. All features implemented except trend graph with multiple parameters on Y-axis
TJ Updated by Thomas Joseph about 1 month ago
- Precedes deleted (Task #2917: System Test Results and Reports )
TJ Updated by Thomas Joseph 29 days ago
06/02/2026
Sample Report format shared with customer => https://elpisit-my.sharepoint.com/:b:/g/personal/satish_sl_elpisitsolutions_com/IQB08nSLrUtVQLCaJyEClhUrAc31YvNWk3e8GrahBgw8Rr0?e=2eoWAZ
From: Venu <venu@elpisitsolutions.com>
Sent: Friday, February 6, 2026 2:44 PM
To: METHESH <project.electrical@cholaturbo.com>;
Subject: Re: New requirements and clarifications
TJ Updated by Thomas Joseph 29 days ago
09/02/2026
Customer reviewd and recommended report
From: METHESH <project.electrical@cholaturbo.com>
Sent: Monday, February 9, 2026 12:34 PM
To: Venu <venu@elpisitsolutions.com>
Subject: Re: New requirements and clarifications
TJ Updated by Thomas Joseph 29 days ago
two different parameter names:
Active Energy Imported_KWH
Active Energy Exported_KWH
Additionally, the following parameters are not present in the reports:
Voltage L-N Avg
Reactive Power
Apparent Power
Clarification requested (Neha)
TJ Updated by Thomas Joseph 29 days ago
10/02/2026
Customer recommendation
a. remove the following tags from the report and dashboard.
Voltage L-N Avg
Reactive Power
Apparent Power
b. add the two tags additional in dashboard and as well as report
Active Energy Imported_KWH
Active Energy Exported_KWH
c. Final PLC Modbus address map => https://elpisit-my.sharepoint.com/:b:/g/personal/satish_sl_elpisitsolutions_com/IQBmDb5XBJKDSIMusD4FaDHAAfIsNaUZWmtUfJ21Od3GDy4?e=4fU34H