Task #2973
openTask #2969: Assembly
Mechanical Assembly
Added by Thomas Joseph 2 months ago. Updated 28 days ago.
Files
| shared image (13).jpg (357 KB) shared image (13).jpg | Surendra Naik, 22/01/2026 12:53 PM | ||
| shared image (11).jpg (423 KB) shared image (11).jpg | Surendra Naik, 22/01/2026 12:53 PM | ||
| shared image (12).jpg (530 KB) shared image (12).jpg | Surendra Naik, 22/01/2026 12:53 PM | ||
| shared image (15).jpg (258 KB) shared image (15).jpg | Surendra Naik, 22/01/2026 12:56 PM | ||
| shared image (14).jpg (331 KB) shared image (14).jpg | Surendra Naik, 22/01/2026 12:56 PM |
TJ Updated by Thomas Joseph about 2 months ago Actions #1
- Status changed from New to In Progress
- % Done changed from 0 to 10
Complete IO Assembly, test USB PCB with cable and handover to S/W team for testing (w/o enclosure)
TJ Updated by Thomas Joseph about 2 months ago ยท Edited Actions #2
- % Done changed from 10 to 70
One sample unit assembled and evaluated. Identified the issues, updated the design and informed fabricator
refer =>
a. http://5.161.106.25:3000/issues/2947#note-11
b. http://5.161.106.25:3000/issues/2938#note-11
DT Updated by Dhanasekar T about 2 months ago Actions #3
- Assignee changed from Dhanasekar T to Surendra Naik
@Surendra Naik ,Please do LED PCB & Mechanical assembly and integrate with enclosure.
SN Updated by Surendra Naik about 2 months ago Actions #4
- File shared image (13).jpg shared image (13).jpg added
- File shared image (12).jpg shared image (12).jpg added
- File shared image (11).jpg shared image (11).jpg added
- % Done changed from 70 to 80
I completed the USB PCB assembly, fixed it on the I/O PCB board, placed everything inside the full enclosure, and also arranged a separate debug port.
SN Updated by Surendra Naik about 2 months ago Actions #5
- File shared image (14).jpg shared image (14).jpg added
- File shared image (15).jpg shared image (15).jpg added
- % Done changed from 80 to 100
I assembled the LED PCB and fixed it to the top enclosure; the wiring is also good. I fully closed two sets of enclosures with the LED PCB and USB cable and handed them over to Devi Priya for software testing.
TJ Updated by Thomas Joseph about 2 months ago Actions #6
- Due date changed from 16/01/2026 to 23/01/2026
Final assembly delayed due to delay in http://5.161.106.25:3000/issues/3157#note-4
TJ Updated by Thomas Joseph about 2 months ago Actions #7
- % Done changed from 100 to 90
TJ Updated by Thomas Joseph about 2 months ago Actions #8
TJ Updated by Thomas Joseph about 1 month ago Actions #9
- Due date changed from 23/01/2026 to 28/01/2026
TJ Updated by Thomas Joseph 28 days ago Actions #10
- Status changed from In Progress to Resolved
- % Done changed from 90 to 100
02/02/2026
Mech. assembly completed