Actions
Task #3000
openTask #2998: Assembly
Assembly Manual (Documentation)
Task #3000:
Assembly Manual (Documentation)
Start date:
07/01/2026
Due date:
14/01/2026 (about 4 months late)
% Done:
50%
Estimated time:
Updated by VenuMadhav S 3 months ago
- Status changed from New to In Progress
- % Done changed from 0 to 50
Updated by VenuMadhav S 3 months ago
· Edited
PLCIO integration Assembly completed and document needs to be prepare.
Updated by Thomas Joseph 3 months ago
· Edited
use this also => http://5.161.106.25:3000/issues/3169#note-2
Define assembly order
In Hylam sheet, three options (instead of Hex SS standoff)
- Use counter sunk in enclosure, M3 clear hole in Hylam sheet, use long counter sink screws and insert from bottom cover outside , nut from other end
- use oversized clear hole at the enclosure, use panhead screws, close the enclosure holes using dummy plug stopper using https://www.amazon.in/FABITTO-Irrigation-Accessories-Stopper-Unwanted/dp/B07TVYHNMD. The box bottom will be raised due to stopper head. identify head with thin size
- weld the nut at the bottom side of hylam sheet and use bolt from top of the PCB
Decided to use 2