Project

General

Profile

Actions

Task #3126

open
TJ RK

Task #3046: Detailed Design

Task #3154: Design and Development of Controller+4G(N58) PCB

Controller PCB BoM

Task #3126: Controller PCB BoM

Added by Thomas Joseph about 2 months ago. Updated 26 days ago.

Status:
Resolved
Priority:
Normal
Assignee:
Start date:
09/02/2026
Due date:
11/02/2026 (28 days late)
% Done:

100%

Estimated time:
Spent time:

Related issues 1 (1 open0 closed)

Copied to mTracker(Mid Range GW)-Production - Task #3246: Interface PCB BoMResolvedResmi K.V09/02/202611/02/2026

Actions
Actions

Also available in: PDF Atom