Actions
Task #3211
openTask #3210: Testing
PLCIO PCB Electrical Testing and Bring-up
Task #3211:
PLCIO PCB Electrical Testing and Bring-up
Start date:
25/06/2026
Due date:
26/06/2026 (about 2 months late)
% Done:
60%
Estimated time:
Spent time:
Updated by Thomas Joseph 8 months ago
- Parent task set to #3210
Updated by Thomas Joseph 8 months ago
- Subject changed from IO Module PCB Electrical Testing to IO PCB Electrical Testing
Updated by Thomas Joseph 7 months ago
- Subject changed from IO PCB Electrical Testing to PLCIO PCB Electrical Testing
Updated by Thomas Joseph 7 months ago
- Due date set to 03/03/2026
- Start date set to 03/03/2026
Updated by Thomas Joseph 7 months ago
- Assignee changed from VenuMadhav S to Resmi K.V
Updated by Thomas Joseph 3 months ago
- Target version set to GW 2.2 Design
Updated by Thomas Joseph 2 months ago
- Due date changed from 03/03/2026 to 26/06/2026
- Status changed from New to In Progress
- Start date changed from 03/03/2026 to 25/06/2026
- % Done changed from 0 to 10
LM2931ADT-5.0 requires 100uF output Cap
Updated by Thomas Joseph 2 months ago
- % Done changed from 10 to 40
PLCIO U2 U3 part no change
Updated by Thomas Joseph 2 months ago
- Subject changed from PLCIO PCB Electrical Testing to PLCIO PCB Electrical Testing and Bring-up
Updated by Thomas Joseph 2 months ago
SPI Signals crossing isolation, but U4 need to replace
Updated by Thomas Joseph 2 months ago
- % Done changed from 40 to 60
DI MISO PU added @ U13.44 sing 10K
DO MISO PU Added @ U14.4 sing 10K
These PUs were necessary for U7 inputs idle high
PLCIO Bring-up Summary
--ADC SPI signal Verified and found getting MISO correct values.
--DI SPI signal verified and found MISO values
--DO ( Infineon TLE75620 ) SPI checked. No deviation noticed. Need to verify with a continuous register read as follows
----DO: TLE75620
----Configure SPI with CPOL=0, NCPHA=0 (Mode )
----Read Diagnosis
------Tx = 0x00010001
------Rx = 0xaaaabbbb
------display RX value, data is 0xbbbb
Updated by Thomas Joseph 2 months ago
1/7/2026
DO Bring up
ADC Data verification
Actions