Project

General

Profile

Actions

Bug #3344

open

Task #2985: Detailed Design

Task #2989: Embedded SW-Development

USB LED (Green) is not meeting the specified requirement

Bug #3344: USB LED (Green) is not meeting the specified requirement

Added by Jagatheswaran J 2 months ago. Updated about 1 month ago.

Status:
In Progress
Priority:
Normal
Target version:
-
Start date:
20/03/2026
Due date:
07/04/2026 (27 days late)
% Done:

90%

Estimated time:
Severity:
Minor

Description

Except for the red power LED, other LEDs are not meeting the requirement.

Updated by Jagatheswaran J about 2 months ago Actions #1

  • Assignee changed from Gowri G to DEVI PRIYAA

Updated by Jagatheswaran J about 2 months ago Actions #2

  • Status changed from New to In Progress

Updated by Sunder Venugopal about 2 months ago Actions #3

  • Assignee changed from DEVI PRIYAA to Channamallikarjuna Mattihalli

Updated by Jagatheswaran J about 2 months ago Actions #4

  • Assignee changed from Channamallikarjuna Mattihalli to Greeshma Rayani

I have tested the LEDs. The USB LED (Green) is not meeting the specified requirement. I am assigning this task to Greeshma.

Updated by Sunder Venugopal about 2 months ago Actions #5

  • Subject changed from LED Issue-LEDs are not meeting the requirement. to USB LED (Green) is not meeting the specified requirement

USB Green LED does not turn on when USB tool connected.

Updated by Sunder Venugopal about 2 months ago Actions #6

  • Due date set to 18/03/2026

Updated by Sunder Venugopal about 2 months ago Actions #7

  • % Done changed from 0 to 20

Updated by Thomas Joseph about 2 months ago Actions #8

  • Parent task set to #2989

Updated by Greeshma Rayani about 1 month ago Actions #9

  • Assignee changed from Greeshma Rayani to Jagatheswaran J

There is a small change in usb led

During data transfer led will blink 2 times.
When error occurs in data transmission led will blink continuosly.
i have updated the led functionality in document below is the onedrive link
https://elpisit-my.sharepoint.com/:x:/g/personal/satish_sl_elpisitsolutions_com/IQAenj5K50l3TpIS8yGYuoHeAbinfWxrZxCUZn4OPBDHkjU?e=njaAdB

Updated by Jagatheswaran J about 1 month ago Actions #10

  • % Done changed from 20 to 90
Actions

Also available in: PDF Atom