Task #3726
openMumbai-Expo-July-2026
Added by Thomas Joseph about 2 months ago. Updated about 2 months ago.
Files
| motor setup1.jfif (113 KB) motor setup1.jfif | Sumanth D, 15/07/2026 04:42 AM | ||
| motor setup2.jfif (362 KB) motor setup2.jfif | Sumanth D, 15/07/2026 04:42 AM |
Updated by Thomas Joseph about 2 months ago
Actions
#1
- Subject changed from Mumbai-Expo to Mumbai-Expo-July-2026
Updated by Thomas Joseph about 2 months ago
Actions
#2
- Assignee set to Dhanasekar T
- % Done changed from 0 to 10
Products to Display:
- Vibration Analyser - in Carry case (miniPC + Display + LAN Switch + 12V Buck Converter + 24V MRE input)
- Motor Setup in a transparent box, knob outside, 12VD input
- mDAQ Lite (135mm x 90mm)
- mDAQ RTU (135mm x 90mm)
- MTracker 2.1 (Checkpoint)
- EDGE Gateway (135mm x 90mm)
- MTracker (GW3.1) (135mm x 90mm)
- E-IDOS
- Temperature sensor
- DI/DO Simulator Box
Updated by Thomas Joseph about 2 months ago
ยท Edited
Actions
#3
- In stock
a. mDAQ-Lite - two boxes in stock with screen printing
b. mDAQ-RTU PCB - 3 nos
c. Temperature sensor
d. mTracker 2.1 with 4 AI
- ToDo
a. mTracker 3.1 - to fabricate of 5 enclosure (including KT Telematics delivery)
b. mDAQ-Lite - 12 boxes to fabricate with screen printing (For Core4 delivery)
c. mDAQ-RTU - 3 boxes to fabricate with screen printing (including boxes for core4 delivery)
d. EDGE-GATEWAY-1 box to fabricate
e. Vibration analyseri. SAM PCB Rework
ii. miniPC - Thinvent/new
iii. miniUPS - not required
iv. Micritips Display followup
v. Waveshare Display - buy if SAM PCB available
f. Enclosure for Motor Setup - identify an enclosure with transparent lid
g. DI Simulator box - identify a box, design and fabricate
@Sumanth D to coordinate
Updated by Sumanth D about 2 months ago
Actions
#4
- Assignee changed from Dhanasekar T to Sumanth D
Arranged Motor setup for Vibration analyzer for expo
Updated by Sumanth D about 2 months ago
Actions
#5
- File motor setup2.jfif motor setup2.jfif added
- File motor setup1.jfif motor setup1.jfif added
Updated by Sumanth D about 2 months ago
Actions
#6
- % Done changed from 10 to 100
Arranged Demo units
- 8 DI
- 4 AI
- Edge Gateway
- VAS(mDAQ3)
- mTracker lite(Dummy Piece)