Description
Testing of 2 PCBs after assembly from microvision
TJ Updated by Thomas Joseph about 2 months ago Actions #1
- Due date changed from 20/01/2026 to 21/01/2026
TJ Updated by Thomas Joseph about 2 months ago Actions #2
- Assignee set to Bhavani M
TJ Updated by Thomas Joseph about 2 months ago Actions #3
- Priority changed from Normal to Urgent
TJ Updated by Thomas Joseph about 2 months ago Actions #4
- Due date changed from 21/01/2026 to 23/01/2026
date extended due to delay in http://5.161.106.25:3000/issues/2997#note-10
VS Updated by VenuMadhav S about 2 months ago Actions #5
- % Done changed from 0 to 30
We received the GW V2.0 assembled PCB's from uV.
Started the testing. We identified the components wrong placement at the I/P protection section and sub sequent sections.
Due to that it testing got delayed.
TJ Updated by Thomas Joseph about 1 month ago · Edited Actions #6
- Status changed from New to In Progress
GW2.0 Inspection and testing (Suspected assembly with wrong components)
Using microscope, check the assembly quality like dry soldering, DNP mismatch, missing components
Identify critical components, and mark it in the schematic. Wrong components in this place will damage the board if powered.
Make sure these components are as er design
examples
feedback network in regulators
RS485 Rx diver n/w (1K, 2K)
Power-up,
check other components by measuring the voltages
test all functionalities and interfaces. If it doesn't work, check the associated components
@Bhavani M : Please upload inspection report in project folder and give link
TJ Updated by Thomas Joseph about 1 month ago Actions #7
- Due date changed from 23/01/2026 to 27/01/2026
Due date extended do to assembly issues
BM Updated by Bhavani M about 1 month ago · Edited Actions #8
- % Done changed from 30 to 80
Visual Inspection, rework and DNP Components assembled for microcontroller PCB boards- (260301, 260302).
TJ Updated by Thomas Joseph about 1 month ago Actions #9
- Due date changed from 27/01/2026 to 28/01/2026
BM Updated by Bhavani M about 1 month ago · Edited Actions #10
- % Done changed from 80 to 100
Testing completed for Microcontroller and 4g Boards.(260301, 260302,260303).
BM Updated by Bhavani M about 1 month ago Actions #11
- % Done changed from 100 to 90
TJ Updated by Thomas Joseph 28 days ago Actions #12
- Status changed from In Progress to Resolved
- % Done changed from 90 to 100
SV Updated by Sunder Venugopal 21 days ago Actions #13
- Due date changed from 28/01/2026 to 20/02/2026
- Status changed from Resolved to In Progress
Adding 3 new similar boards for Testing
BM Updated by Bhavani M 19 days ago · Edited Actions #14
- % Done changed from 100 to 30
Visual Inspection for Gateway_v2.0 Boards.
260701
260702
260703
260704
260705
260706
https://elpisit-my.sharepoint.com/:f:/g/personal/satish_sl_elpisitsolutions_com/IgBf8PQ-dWzGSIn_bKJ5mWAwAf_Rsyc120XWt_nBAUrGEVo?e=mArdHq.--------visual inspection report.
BM Updated by Bhavani M 19 days ago Actions #15
Rework and Power circuit Electrical testing for MCU Boards.
260701
260702
260703