Project

General

Profile

Actions

Task #3336

open

Phase 0A

Task #3336: Phase 0A

Added by Thomas Joseph 2 months ago. Updated about 2 months ago.

Status:
Analysis Started
Priority:
Normal
Assignee:
Target version:
Start date:
27/02/2026
Due date:
13/03/2026 (52 days late)
% Done:

75%

Estimated time:
20:00 h
Spent time:
8:00 h (Total: 10:00 h)

Description

TV2.1 with RS232 , RS485, WiFi cor K T Telematics demo


Files

image (93).png (369 KB) image (93).png Gowri G, 11/03/2026 06:52 AM
image (92).png (158 KB) image (92).png Gowri G, 11/03/2026 06:52 AM
image (32).jpg (32.6 KB) image (32).jpg Gowri G, 11/03/2026 06:52 AM
image (88).png (255 KB) image (88).png Gowri G, 11/03/2026 06:52 AM
image (89).png (255 KB) image (89).png Gowri G, 11/03/2026 06:53 AM
image (93).png
image (92).png
image (32).jpg
image (88).png
image (89).png

Subtasks 4 (4 open0 closed)

Task #3337: TV2.1 Hardware ReadinessResolvedSurendra Naik02/03/202602/03/2026

KT - Trial 1Actions
Task #3338: Embedded SW-Development(Release x.y)NewYoganand D27/02/202613/03/2026

KT - Trial 1Actions
Task #3339: Weighing Scale data over RS232ResolvedYoganand D27/02/202613/03/2026

KT - Trial 1Actions
Task #3340: Modbus RTU(Flow data)ResolvedYoganand D27/02/202613/03/2026

KT - Trial 1Actions

Related issues 1 (1 open0 closed)

Copied to Gateway 3.0 - Task #3354: Phase 0BResolvedGowri G02/03/202630/03/2026

KT - Trial 1Actions

Updated by Thomas Joseph 2 months ago Actions #1

  • Subtask #3337 added

Updated by Thomas Joseph 2 months ago Actions #2

  • Subtask #3338 added

Updated by Thomas Joseph 2 months ago Actions #3

  • Subtask #3339 added

Updated by Thomas Joseph 2 months ago Actions #4

  • Subtask #3340 added

Updated by Thomas Joseph 2 months ago Actions #5

  • Subtask deleted (#3339)

Updated by Thomas Joseph 2 months ago Actions #6

  • Subtask deleted (#3340)

Updated by Thomas Joseph 2 months ago Actions #7

  • Description updated (diff)

Updated by Thomas Joseph about 2 months ago Actions #8

Updated by Thomas Joseph about 2 months ago Actions #9

  • Subject changed from Phase 0 to Phase 0A

Updated by Gowri G about 2 months ago ยท Edited Actions #10

image (93).png
image (92).png
image (32).jpg
image (88).png
image (89).png

Developement 1: Tracker V2P1- WIFI
1.Implementation of RS232 on tracker v2p1 was done and tested based on the customer requirement.
2.Overall testing was done on tracker v2p1 in the local server using the modbus slave simulator for sending the RS485 data and the using the YAT terminal RS232 data was verified.
3.Parsing was verified and the data packets was posting on local server through wifi

Updated by Sunder Venugopal about 2 months ago Actions #11

  • Target version set to KT - Trial 1

Updated by Gowri G about 2 months ago Actions #12

  • File deleted (image (90).png)

Updated by Gowri G about 2 months ago Actions #13

  • File deleted (image (91).png)

Updated by Gowri G about 2 months ago Actions #14

  • Estimated time changed from 16:00 h to 20:00 h
Actions

Also available in: PDF Atom