Task #3354

open

Phase 0B

Task #3354: Phase 0B

Added by Thomas Joseph about 2 months ago. Updated about 1 month ago.

Status:
Resolved
Priority:
Normal
Assignee:
Target version:
Start date:
02/03/2026
Due date:
30/03/2026 (35 days late)
% Done:

100%

Estimated time:
24:00 h (Total: 40:00 h)
Spent time:
88:00 h (Total: 112:12 h)

Description

TV3.0 with RS232 , RS485, 4G cor K T Telematics demo


Files

image (91) (1).png (176 KB) image (91) (1).png Gowri G, 18/03/2026 06:45 AM
image (90) (1).png (158 KB) image (90) (1).png Gowri G, 18/03/2026 06:45 AM
image (33).jpg (28.1 KB) image (33).jpg Gowri G, 18/03/2026 06:46 AM
RS232_LOG2.txt (2.8 KB) RS232_LOG2.txt Gowri G, 18/03/2026 06:46 AM
RS232_LOG1.txt (969 Bytes) RS232_LOG1.txt Gowri G, 18/03/2026 06:46 AM
image (95).png (70.1 KB) image (95).png Gowri G, 18/03/2026 06:47 AM
KT_telematics_chiller_modbusmapping.txt (5.31 KB) KT_telematics_chiller_modbusmapping.txt Gowri G, 23/03/2026 06:51 AM
Promethean Query.jpg (37.2 KB) Promethean Query.jpg Gowri G, 23/03/2026 06:52 AM
image (91) (1).png
image (90) (1).png
image (33).jpg
image (95).png
Promethean Query.jpg

Subtasks 5 (4 open1 closed)

Task #3355: TV3.0 Hardware ReadinessResolvedSurendra Naik02/03/202602/03/2026

KT - Trial 1Actions
Task #3356: Embedded SW-DevelopmentIn ProgressYoganand D09/03/2026

KT - Trial 1Actions
Task #3359: Data posting over 4GClosedGowri G09/03/2026

KT - Trial 1Actions
Task #3451: Onsite Demo and installationNewGowri G30/03/2026

KT - Trial 1Actions
Task #3452: DeliveryResolvedDhanasekar T

KT - Trial 1Actions

Related issues 1 (1 open0 closed)

Copied from Gateway 3.0 - Task #3336: Phase 0AAnalysis StartedGowri G27/02/202613/03/2026

KT - Trial 1Actions

Updated by Thomas Joseph about 2 months ago Actions #1

Updated by Thomas Joseph about 2 months ago Actions #2

  • Subtask #3355 added

Updated by Thomas Joseph about 2 months ago Actions #3

  • Subtask #3356 added

Updated by Thomas Joseph about 2 months ago Actions #4

  • Subject changed from Phase 0_A to Phase 0B

Updated by Thomas Joseph about 2 months ago Actions #5

  • Assignee changed from Yoganand D to Gowri G

Updated by Gowri G about 2 months ago Actions #6

  • Status changed from New to In Progress

Updated by Gowri G about 2 months ago Actions #7

image (91) (1).png
image (90) (1).png
image (33).jpg
image (95).png

Developement 2: Tracker v3 - 4g

Implementation of RS485 on Tracker V3 was done and tested based on the customer requirement.
1.Overall testing was done on Trackerv3 in the local server using the modbus slave simulator for sending the RS485 data
2.Pending RS232 Implementation was done using the YAT terminal RS232 data needs to verified.
3.Posting of rs485 data through 4G was done
4.Need to verify the RS232 data parsing.
5.Both rs485 and rs232 development was done through 4g
6.Ready for the demo.

Updated by Gowri G about 1 month ago Actions #8

Promethean Query.jpg

Conducted the demo on Customer place at KT telematics,Sangagiri

Summary:
HATSUN dairys,Tharamangalam,salem - Demo - Tracker V3 Device with RS232 and RS485- 16/03/2026
They are using Promethane
Demo was showed to the customer for RS232 data- Getting accurate from the weighing scale and was posted to the Eremos Cloud Server through 4G.
For RS485 data- We are not sure about the address mapping properly,through the usb to rs485 device we can able to send the address and response but through SAML21 device we cant get the response shows timeout error.
Suggestion:
Venu sir:
As per the suggestion of Venu sir,We showed the RS232 data to the Customer and the RS485 data needs to be validate.
Raised the Query to the Promethean Power system for 8 Relay Board rs485 port and address mapping.
Sir shared one document regarding the address mapping.
Thomas Sir:
Thomas sir suggested to conduct the test as follows
1.Connect Tracker, Promethean device and 485-USB converter in the 485 bus. observe traffic in teraterm.
2.Please setup this in lab(use modbus tool in place of Promethean device) and observe.
Link for Customer Demo - KT Telematics
https://elpisit-my.sharepoint.com/:f:/g/personal/satish_sl_elpisitsolutions_com/IgDBLMeJywHZRosv9o83Y5SRAaPX5eXwb83QrIllhqrzZ0U?e=JZjGkW

Updated by Thomas Joseph about 1 month ago Actions #9

  • Target version set to KT - Trial 1

Updated by Thomas Joseph about 1 month ago Actions #10

  • Subtask #3451 added

Updated by Thomas Joseph about 1 month ago Actions #11

  • Subtask #3452 added