Task #3120
openProject Planning and Review
Description
For time-sheet reporting purpose ONLY based on email from HR dated 08/01/2026 Subject: Mandatory Submission of Weekly Timesheet
Updated by Thomas Joseph 4 months ago
- Due date set to 16/02/2026
- Start date set to 05/01/2026
Updated by Thomas Joseph 3 months ago
- % Done changed from 0 to 50
Updated by Thomas Joseph 3 months ago
- Due date changed from 16/02/2026 to 06/03/2026
- % Done changed from 50 to 60
Updated by Thomas Joseph 2 months ago
Discussion with Venumadhav
-
Controller PCB Super Cap mounting - orientation to change
-
Super cap - backup time analisys to do
-
schema - why super cap charging from 5.5V
-
Why RTC VBAT not switching - analysis to do
-
create views and share design folder for renaming
-
after renaming, continue sst placement
-
prepare section-wise costing all 4 PCBs
-
Design PLCIO connector PCB, do step mapping of all PCBs in enclosure - step1 - PLCIO normal orentation, step2 - PLCIO180deg rotated
-
Design of GW2.0 4G PCB with N58 in place of N720
-
assemble platform for GW2.0 with TV3.0 N720 PCB - Surendra to do
-
Order components for board bring-up assembly and mechanical fitment - 5 sets for PLCIO, connector, inerface, controller, enclosure
-
ISRO - List the activities at site, Send Surendra/Dhanasekar for new requirement support(Tracker demo for relay status)