Discussion with Venumadhav
-
Controller PCB Super Cap mounting - orientation to change
-
Super cap - backup time analisys to do
-
schema - why super cap charging from 5.5V
-
Why RTC VBAT not switching - analysis to do
-
create views and share design folder for renaming
-
after renaming, continue sst placement
-
prepare section-wise costing all 4 PCBs
-
Design PLCIO connector PCB, do step mapping of all PCBs in enclosure - step1 - PLCIO normal orentation, step2 - PLCIO180deg rotated
-
Design of GW2.0 4G PCB with N58 in place of N720
-
assemble platform for GW2.0 with TV3.0 N720 PCB - Surendra to do
-
Order components for board bring-up assembly and mechanical fitment - 5 sets for PLCIO, connector, inerface, controller, enclosure
-
ISRO - List the activities at site, Send Surendra/Dhanasekar for new requirement support(Tracker demo for relay status)