open
TJ TJ

Project Planning and Review

Task #3120: Project Planning and Review

Added by Thomas Joseph about 2 months ago. Updated 14 days ago.

Status:
In Progress
Priority:
Normal
Assignee:
Start date:
05/01/2026
Due date:
06/03/2026 (5 days late)
% Done:

60%

Estimated time:
Spent time:

Description

For time-sheet reporting purpose ONLY based on email from HR dated 08/01/2026 Subject: Mandatory Submission of Weekly Timesheet

TJ Updated by Thomas Joseph about 2 months ago Actions #1

  • Due date set to 16/02/2026
  • Start date set to 05/01/2026

TJ Updated by Thomas Joseph 29 days ago Actions #2

  • % Done changed from 0 to 50

TJ Updated by Thomas Joseph 29 days ago Actions #3

  • Due date changed from 16/02/2026 to 06/03/2026
  • % Done changed from 50 to 60

TJ Updated by Thomas Joseph 14 days ago Actions #4

Discussion with Venumadhav

1. Controller PCB Super Cap mounting - orientation to change
2. Super cap - backup time analisys to do
3. schema - why super cap charging from 5.5V
4. Why RTC VBAT not switching - analysis to do
5. create views and share design folder for renaming
6. after renaming, continue sst placement
7. prepare section-wise costing all 4 PCBs

8. Design PLCIO connector PCB, do step mapping of all PCBs in enclosure - step1 - PLCIO normal orentation, step2 - PLCIO180deg rotated
9. Design of GW2.0 4G PCB with N58 in place of N720

10. assemble platform for GW2.0 with TV3.0 N720 PCB - Surendra to do

11. Order components for board bring-up assembly and mechanical fitment - 5 sets for PLCIO, connector, inerface, controller, enclosure

12. ISRO - List the activities at site, Send Surendra/Dhanasekar for new requirement support(Tracker demo for relay status)