Project Planning and Review

Task #3120: Project Planning and Review

Added by Thomas Joseph 4 months ago. Updated 2 months ago.

Status:
In Progress
Priority:
Normal
Assignee:
Target version:
-
Start date:
05/01/2026
Due date:
06/03/2026 (59 days late)
% Done:

60%

Estimated time:
Spent time:

Description

For time-sheet reporting purpose ONLY based on email from HR dated 08/01/2026 Subject: Mandatory Submission of Weekly Timesheet

Updated by Thomas Joseph 4 months ago Actions #1

  • Due date set to 16/02/2026
  • Start date set to 05/01/2026

Updated by Thomas Joseph 3 months ago Actions #2

  • % Done changed from 0 to 50

Updated by Thomas Joseph 3 months ago Actions #3

  • Due date changed from 16/02/2026 to 06/03/2026
  • % Done changed from 50 to 60

Updated by Thomas Joseph 2 months ago Actions #4

Discussion with Venumadhav

  1. Controller PCB Super Cap mounting - orientation to change

  2. Super cap - backup time analisys to do

  3. schema - why super cap charging from 5.5V

  4. Why RTC VBAT not switching - analysis to do

  5. create views and share design folder for renaming

  6. after renaming, continue sst placement

  7. prepare section-wise costing all 4 PCBs

  8. Design PLCIO connector PCB, do step mapping of all PCBs in enclosure - step1 - PLCIO normal orentation, step2 - PLCIO180deg rotated

  9. Design of GW2.0 4G PCB with N58 in place of N720

  10. assemble platform for GW2.0 with TV3.0 N720 PCB - Surendra to do

  11. Order components for board bring-up assembly and mechanical fitment - 5 sets for PLCIO, connector, inerface, controller, enclosure

  12. ISRO - List the activities at site, Send Surendra/Dhanasekar for new requirement support(Tracker demo for relay status)