Hours: 1340:22

Date User Activity Issue Comment Hours Status Author Project Created Target version Tracker Week Category Finish Date Start Date Engr, %effort Team_Size Severity
13/01/2026 Dhanasekar T Procurement Task #3071: Enclosure Screen Printing Screen printing file sent to fabricator 0:30 Resolved Dhanasekar T Chola Turbo 13/01/2026 01:26 PM Task 3 31/03/2026 24/12/2025 VenuM 50%, Neha 100%, Dhan40%, Greeshma 50%, Mallikar100% 4 Actions
13/01/2026 Dhanasekar T Procurement Task #2940: Enclosure fabrication Enclosure moved to saritvat (nexams) 1:00 Resolved Dhanasekar T mTracker(Mid Range GW)-Pilot 13/01/2026 01:25 PM Task 3 30/04/2026 02/01/2026 Thomas(20%), Venumadhav(100%),Dhilip(20%) 3 Actions
13/01/2026 Dhanasekar T Procurement Task #2962: IO PCB Fabrication PCB received 0:30 Resolved Dhanasekar T mTracker(Mid Range GW)-Pilot 13/01/2026 01:22 PM Task 3 30/04/2026 02/01/2026 Thomas(20%), Venumadhav(100%),Dhilip(20%) 3 Actions
13/01/2026 Dhanasekar T Procurement Task #3070: Enclosure Screen Printing Screen printing file sent to fabricator 1:00 Resolved Dhanasekar T mTracker(Mid Range GW)-Pilot 13/01/2026 01:18 PM Task 3 30/04/2026 02/01/2026 Thomas(20%), Venumadhav(100%),Dhilip(20%) 3 Actions
13/01/2026 Prakash M Development Task #3021: E-REMOS device configuration & Dashboard setup A real (floating-point) data type Modbus parameter has been added to E-REMOS. 5:00 Resolved Prakash M Chola Turbo 13/01/2026 12:47 PM Task 3 31/03/2026 24/12/2025 VenuM 50%, Neha 100%, Dhan40%, Greeshma 50%, Mallikar100% 4 Actions
13/01/2026 Thomas Joseph Design Task #2986: Design of Enclosure Cutouts Design Discussion 0:15 Resolved Thomas Joseph mDAQ4-1(Mid Range mDAQ)-Pilot 13/01/2026 07:39 AM Task 3 30/04/2026 02/01/2026 Thomas(20%), Venumadhav(100%),Dhilip(20%) 3 Actions
13/01/2026 Thomas Joseph Meeting Task #2928: Testing of PLCIO Stacked boards with CTB platform Status meeting discussion on action items 0:45 Resolved Thomas Joseph mDAQ4-1(Mid Range mDAQ)-Pilot 13/01/2026 07:39 AM Task 3 30/04/2026 02/01/2026 Thomas(20%), Venumadhav(100%),Dhilip(20%) 3 Actions
13/01/2026 Thomas Joseph Meeting Task #3037: Project Planning and Review Team review meeting - Resource/Timeline 0:45 Resolved Thomas Joseph Chola Turbo 13/01/2026 05:53 AM Task 3 31/03/2026 24/12/2025 VenuM 50%, Neha 100%, Dhan40%, Greeshma 50%, Mallikar100% 4 Actions
12/01/2026 Thomas Joseph Design Task #3069: Preliminary Design System Study and Design Plan 1:00 In Progress Thomas Joseph mTracker(Mid Range GW)-Production 13/01/2026 04:25 AM Task 3 31/03/2026 02/01/2026 Thomas(30%), Venumadhav(100%),Dhilip(20%) 3 Actions
12/01/2026 Thomas Joseph Testing Task #2928: Testing of PLCIO Stacked boards with CTB platform PLCIO Debug Support 0:30 Resolved Thomas Joseph mDAQ4-1(Mid Range mDAQ)-Pilot 13/01/2026 03:37 AM Task 3 30/04/2026 02/01/2026 Thomas(20%), Venumadhav(100%),Dhilip(20%) 3 Actions
12/01/2026 Thomas Joseph Design Task #2986: Design of Enclosure Cutouts Mechanical Design Plan 1:30 Resolved Thomas Joseph mDAQ4-1(Mid Range mDAQ)-Pilot 13/01/2026 03:36 AM Task 3 30/04/2026 02/01/2026 Thomas(20%), Venumadhav(100%),Dhilip(20%) 3 Actions
12/01/2026 Thomas Joseph Meeting Task #3039: Project Planning and Review Planning and Review 0:45 In Progress Thomas Joseph mDAQ4-1(Mid Range mDAQ)-Pilot 13/01/2026 03:35 AM Task 3 30/04/2026 02/01/2026 Thomas(20%), Venumadhav(100%),Dhilip(20%) 3 Actions
12/01/2026 Thomas Joseph Meeting Task #3038: Project Planning and Review Planning and Review 0:20 In Progress Thomas Joseph mTracker(Mid Range GW)-Pilot 13/01/2026 03:34 AM Task 3 30/04/2026 02/01/2026 Thomas(20%), Venumadhav(100%),Dhilip(20%) 3 Actions
12/01/2026 Thomas Joseph Meeting Task #3037: Project Planning and Review Planning and Review 0:20 Resolved Thomas Joseph Chola Turbo 13/01/2026 03:33 AM Task 3 31/03/2026 24/12/2025 VenuM 50%, Neha 100%, Dhan40%, Greeshma 50%, Mallikar100% 4 Actions
12/01/2026 Thomas Joseph Meeting Task #3037: Project Planning and Review Critical Project Update call 1:00 Resolved Thomas Joseph Chola Turbo 13/01/2026 03:32 AM Task 3 31/03/2026 24/12/2025 VenuM 50%, Neha 100%, Dhan40%, Greeshma 50%, Mallikar100% 4 Actions
12/01/2026 Channamallikarjuna Mattihalli Development Task #2953: Modbus-TCP Modbus TCP reading data from Server i.e PLC we used software MODBUS SIM 8:00 Resolved Channamallikarjuna Mattihalli Chola Turbo 12/01/2026 01:04 PM Task 3 31/03/2026 24/12/2025 VenuM 50%, Neha 100%, Dhan40%, Greeshma 50%, Mallikar100% 4 Actions
12/01/2026 Jagatheswaran J Documentation Task #2913: Test Plan Development and Approvals testcase document update 6:00 In Progress Jagatheswaran J Chola Turbo 12/01/2026 11:37 AM Task 3 31/03/2026 24/12/2025 VenuM 50%, Neha 100%, Dhan40%, Greeshma 50%, Mallikar100% 4 Actions
12/01/2026 Dhanasekar T Documentation Task #3019: IO PCB BoM Updated 1:00 Resolved Dhanasekar T mTracker(Mid Range GW)-Pilot 12/01/2026 11:12 AM Task 3 30/04/2026 02/01/2026 Thomas(20%), Venumadhav(100%),Dhilip(20%) 3 Actions
12/01/2026 Dhanasekar T PCB assembly Task #3051: GW2.0 PCB Assembly Components sent to uV for assembly 0:06 Closed Dhanasekar T mDAQ4-1(Mid Range mDAQ)-Pilot 12/01/2026 10:13 AM Task 3 30/04/2026 02/01/2026 Thomas(20%), Venumadhav(100%),Dhilip(20%) 3 Actions
12/01/2026 Dhanasekar T Procurement Task #3051: GW2.0 PCB Assembly Components sent to uV for assembly 0:30 Closed Dhanasekar T mDAQ4-1(Mid Range mDAQ)-Pilot 12/01/2026 10:12 AM Task 3 30/04/2026 02/01/2026 Thomas(20%), Venumadhav(100%),Dhilip(20%) 3 Actions
12/01/2026 Dhanasekar T Procurement Task #2996: GW 2.0 PCB Fabrication 5 sets of Panel PCB received 0:30 Resolved Dhanasekar T mDAQ4-1(Mid Range mDAQ)-Pilot 12/01/2026 10:11 AM Task 3 30/04/2026 02/01/2026 Thomas(20%), Venumadhav(100%),Dhilip(20%) 3 Actions
12/01/2026 Sumanth D Testing Task #2930: Test PLCIO with CTB application Testing 3:00 Resolved Sumanth D mDAQ4-1(Mid Range mDAQ)-Pilot 12/01/2026 04:45 AM Task 3 30/04/2026 02/01/2026 Thomas(20%), Venumadhav(100%),Dhilip(20%) 3 Actions
12/01/2026 Channamallikarjuna Mattihalli Development Task #2953: Modbus-TCP Modbus TCP on SAME54 controller to read PLC data 8:00 Resolved Channamallikarjuna Mattihalli Chola Turbo 12/01/2026 03:55 AM Task 3 31/03/2026 24/12/2025 VenuM 50%, Neha 100%, Dhan40%, Greeshma 50%, Mallikar100% 4 Actions
12/01/2026 Thomas Joseph Documentation Task #2957: Customer Requirements Finalisation customer requirement documentation 1:30 Resolved Thomas Joseph Chola Turbo 11/01/2026 02:46 PM Task 3 31/03/2026 24/12/2025 VenuM 50%, Neha 100%, Dhan40%, Greeshma 50%, Mallikar100% 4 Actions
09/01/2026 Thomas Joseph Design Task #2984: Preliminary Design Design planning 1:00 In Progress Thomas Joseph mDAQ4-1(Mid Range mDAQ)-Pilot 10/01/2026 05:04 PM Task 2 30/04/2026 02/01/2026 Thomas(20%), Venumadhav(100%),Dhilip(20%) 3 Actions
09/01/2026 Thomas Joseph Design Task #2966: Wiring Diagram Wiring diagram planning 1:00 In Progress Thomas Joseph mTracker(Mid Range GW)-Pilot 10/01/2026 05:03 PM Task 2 30/04/2026 02/01/2026 Thomas(20%), Venumadhav(100%),Dhilip(20%) 3 Actions
09/01/2026 Thomas Joseph Design Task #2960: Wiring Diagram Wiring diagram planning 1:00 Resolved Thomas Joseph Chola Turbo 10/01/2026 05:03 PM Task 2 31/03/2026 24/12/2025 VenuM 50%, Neha 100%, Dhan40%, Greeshma 50%, Mallikar100% 4 Actions
09/01/2026 Thomas Joseph Testing Task #2928: Testing of PLCIO Stacked boards with CTB platform PLCIO Debug Support 0:45 Resolved Thomas Joseph mDAQ4-1(Mid Range mDAQ)-Pilot 10/01/2026 04:40 PM Task 2 30/04/2026 02/01/2026 Thomas(20%), Venumadhav(100%),Dhilip(20%) 3 Actions
09/01/2026 Bhavani M Design Task #3060: Controller PCB Routing Controller Pcb routing 16:00 In Progress Bhavani M Gateway V2.1 09/01/2026 02:06 PM Task 2 31/03/2026 14/08/2025 Venu 30%, Malli 10%, Bhavani 10%, Dhansekar 20%, Surendra 20%, jagathees 20% 1 Actions
09/01/2026 Bhavani M Design Task #3062: Connector PCB Routing Rear side Connector 8:00 Resolved Bhavani M Gateway V2.1 09/01/2026 02:04 PM Task 2 31/03/2026 14/08/2025 Venu 30%, Malli 10%, Bhavani 10%, Dhansekar 20%, Surendra 20%, jagathees 20% 1 Actions
09/01/2026 Bhavani M Design Task #3061: WiFi_4G PCB Routing WiFi_4G PCB Routing 8:00 In Progress Bhavani M Gateway V2.1 09/01/2026 02:01 PM Task 2 31/03/2026 14/08/2025 Venu 30%, Malli 10%, Bhavani 10%, Dhansekar 20%, Surendra 20%, jagathees 20% 1 Actions
09/01/2026 Bhavani M Design Task #3061: WiFi_4G PCB Routing WiFi pcb Routing. 8:00 In Progress Bhavani M Gateway V2.1 09/01/2026 01:59 PM Task 2 31/03/2026 14/08/2025 Venu 30%, Malli 10%, Bhavani 10%, Dhansekar 20%, Surendra 20%, jagathees 20% 1 Actions
09/01/2026 Bhavani M Design Task #3060: Controller PCB Routing Controller PCB Routing- SPI lan 8:00 In Progress Bhavani M Gateway V2.1 09/01/2026 01:43 PM Task 2 31/03/2026 14/08/2025 Venu 30%, Malli 10%, Bhavani 10%, Dhansekar 20%, Surendra 20%, jagathees 20% 1 Actions
09/01/2026 Bhavani M Design Task #3060: Controller PCB Routing On chip lan routing 8:00 In Progress Bhavani M Gateway V2.1 09/01/2026 01:39 PM Task 2 31/03/2026 14/08/2025 Venu 30%, Malli 10%, Bhavani 10%, Dhansekar 20%, Surendra 20%, jagathees 20% 1 Actions
09/01/2026 Bhavani M Design Task #3060: Controller PCB Routing Routing- RS 485 and Rs-232 8:00 In Progress Bhavani M Gateway V2.1 09/01/2026 01:38 PM Task 2 31/03/2026 14/08/2025 Venu 30%, Malli 10%, Bhavani 10%, Dhansekar 20%, Surendra 20%, jagathees 20% 1 Actions
09/01/2026 Bhavani M Design Task #3060: Controller PCB Routing Power section routing 8:00 In Progress Bhavani M Gateway V2.1 09/01/2026 01:37 PM Task 2 31/03/2026 14/08/2025 Venu 30%, Malli 10%, Bhavani 10%, Dhansekar 20%, Surendra 20%, jagathees 20% 1 Actions
09/01/2026 Bhavani M Design Task #3064: Placement Review WiFi_4G PCB Placement Review WiFi_4G PCB 8:00 New Bhavani M Gateway V2.1 09/01/2026 01:26 PM Task 2 31/03/2026 14/08/2025 Venu 30%, Malli 10%, Bhavani 10%, Dhansekar 20%, Surendra 20%, jagathees 20% 1 Actions
09/01/2026 Bhavani M Design Task #3063: Placement Review Controller PCB Rear Side Connector PCB 8:00 In Progress Bhavani M Gateway V2.1 09/01/2026 01:24 PM Task 2 31/03/2026 14/08/2025 Venu 30%, Malli 10%, Bhavani 10%, Dhansekar 20%, Surendra 20%, jagathees 20% 1 Actions
09/01/2026 Bhavani M Design Task #3063: Placement Review Controller PCB Updating 8:00 In Progress Bhavani M Gateway V2.1 09/01/2026 01:21 PM Task 2 31/03/2026 14/08/2025 Venu 30%, Malli 10%, Bhavani 10%, Dhansekar 20%, Surendra 20%, jagathees 20% 1 Actions
09/01/2026 Bhavani M Design Task #3059: PCB Design modification of WiFi_4G PCB placing components 4:00 In Progress Bhavani M Gateway V2.1 09/01/2026 01:15 PM Task 2 31/03/2026 14/08/2025 Venu 30%, Malli 10%, Bhavani 10%, Dhansekar 20%, Surendra 20%, jagathees 20% 1 Actions
09/01/2026 Bhavani M Design Task #3059: PCB Design modification of WiFi_4G PCB Placing Components 8:00 In Progress Bhavani M Gateway V2.1 09/01/2026 01:13 PM Task 2 31/03/2026 14/08/2025 Venu 30%, Malli 10%, Bhavani 10%, Dhansekar 20%, Surendra 20%, jagathees 20% 1 Actions
09/01/2026 Bhavani M Design Task #3059: PCB Design modification of WiFi_4G PCB Board Design modification. 16:00 In Progress Bhavani M Gateway V2.1 09/01/2026 01:11 PM Task 2 31/03/2026 14/08/2025 Venu 30%, Malli 10%, Bhavani 10%, Dhansekar 20%, Surendra 20%, jagathees 20% 1 Actions
09/01/2026 Bhavani M Design Task #3058: PCB Design modification of Controller Step Mapping 8:00 Resolved Bhavani M Gateway V2.1 09/01/2026 01:06 PM Task 2 31/03/2026 14/08/2025 Venu 30%, Malli 10%, Bhavani 10%, Dhansekar 20%, Surendra 20%, jagathees 20% 1 Actions
09/01/2026 Bhavani M Design Task #3058: PCB Design modification of Controller Step Mapping 16:00 Resolved Bhavani M Gateway V2.1 09/01/2026 12:59 PM Task 2 31/03/2026 14/08/2025 Venu 30%, Malli 10%, Bhavani 10%, Dhansekar 20%, Surendra 20%, jagathees 20% 1 Actions
09/01/2026 Bhavani M Design Task #3058: PCB Design modification of Controller placing components 8:00 Resolved Bhavani M Gateway V2.1 09/01/2026 12:56 PM Task 2 31/03/2026 14/08/2025 Venu 30%, Malli 10%, Bhavani 10%, Dhansekar 20%, Surendra 20%, jagathees 20% 1 Actions
09/01/2026 Bhavani M Design Task #3058: PCB Design modification of Controller placing components 8:00 Resolved Bhavani M Gateway V2.1 09/01/2026 12:55 PM Task 2 31/03/2026 14/08/2025 Venu 30%, Malli 10%, Bhavani 10%, Dhansekar 20%, Surendra 20%, jagathees 20% 1 Actions
09/01/2026 Bhavani M Design Task #3058: PCB Design modification of Controller placing components 8:00 Resolved Bhavani M Gateway V2.1 09/01/2026 12:53 PM Task 2 31/03/2026 14/08/2025 Venu 30%, Malli 10%, Bhavani 10%, Dhansekar 20%, Surendra 20%, jagathees 20% 1 Actions
09/01/2026 Bhavani M Design Task #3058: PCB Design modification of Controller Placement components in microcontroller Pcb 8:00 Resolved Bhavani M Gateway V2.1 09/01/2026 12:47 PM Task 2 31/03/2026 14/08/2025 Venu 30%, Malli 10%, Bhavani 10%, Dhansekar 20%, Surendra 20%, jagathees 20% 1 Actions
09/01/2026 Bhavani M Design Task #3058: PCB Design modification of Controller Microcontroller PCB modification. 8:00 Resolved Bhavani M Gateway V2.1 09/01/2026 12:36 PM Task 2 31/03/2026 14/08/2025 Venu 30%, Malli 10%, Bhavani 10%, Dhansekar 20%, Surendra 20%, jagathees 20% 1 Actions
09/01/2026 Bhavani M Design Task #3056: Schematic Design Modification controller PCB Schematic Design Modification controller PCB- Reset Circuit 2:00 In Progress Bhavani M Gateway V2.1 09/01/2026 12:26 PM Task 2 31/03/2026 14/08/2025 Venu 30%, Malli 10%, Bhavani 10%, Dhansekar 20%, Surendra 20%, jagathees 20% 1 Actions
09/01/2026 Bhavani M Design Task #3056: Schematic Design Modification controller PCB Schematic Design Modification controller PCB- USB Section 8:00 In Progress Bhavani M Gateway V2.1 09/01/2026 12:24 PM Task 2 31/03/2026 14/08/2025 Venu 30%, Malli 10%, Bhavani 10%, Dhansekar 20%, Surendra 20%, jagathees 20% 1 Actions
09/01/2026 Bhavani M Design Task #3056: Schematic Design Modification controller PCB Schematic Design Modification controller PCB- SPI Lan 4:00 In Progress Bhavani M Gateway V2.1 09/01/2026 12:23 PM Task 2 31/03/2026 14/08/2025 Venu 30%, Malli 10%, Bhavani 10%, Dhansekar 20%, Surendra 20%, jagathees 20% 1 Actions
09/01/2026 Bhavani M Design Task #3057: Schematic Design Modification WiFi_4G PCB Schematic Design Modification WiFi_4G PCB- G7A module 4:00 In Progress Bhavani M Gateway V2.1 09/01/2026 12:12 PM Task 2 31/03/2026 14/08/2025 Venu 30%, Malli 10%, Bhavani 10%, Dhansekar 20%, Surendra 20%, jagathees 20% 1 Actions
09/01/2026 Bhavani M Design Task #3056: Schematic Design Modification controller PCB Schematic Design Modification controller PCB- RS-485 section, USB section 8:00 In Progress Bhavani M Gateway V2.1 09/01/2026 12:08 PM Task 2 31/03/2026 14/08/2025 Venu 30%, Malli 10%, Bhavani 10%, Dhansekar 20%, Surendra 20%, jagathees 20% 1 Actions
09/01/2026 Bhavani M Design Task #3056: Schematic Design Modification controller PCB Schematic design Modification of microcontroller pcb - LAN SECTION 8:00 In Progress Bhavani M Gateway V2.1 09/01/2026 11:59 AM Task 2 31/03/2026 14/08/2025 Venu 30%, Malli 10%, Bhavani 10%, Dhansekar 20%, Surendra 20%, jagathees 20% 1 Actions
09/01/2026 Bhavani M Design Task #3056: Schematic Design Modification controller PCB Schematic design Modification of microcontroller pcb 8:00 In Progress Bhavani M Gateway V2.1 09/01/2026 11:48 AM Task 2 31/03/2026 14/08/2025 Venu 30%, Malli 10%, Bhavani 10%, Dhansekar 20%, Surendra 20%, jagathees 20% 1 Actions
09/01/2026 Bhavani M Design Task #3056: Schematic Design Modification controller PCB Schematic design Modification of microcontroller pcb 8:00 In Progress Bhavani M Gateway V2.1 09/01/2026 11:47 AM Task 2 31/03/2026 14/08/2025 Venu 30%, Malli 10%, Bhavani 10%, Dhansekar 20%, Surendra 20%, jagathees 20% 1 Actions
09/01/2026 Bhavani M Design Task #3056: Schematic Design Modification controller PCB Schematic design Modification of microcontroller pcb 8:00 In Progress Bhavani M Gateway V2.1 09/01/2026 11:46 AM Task 2 31/03/2026 14/08/2025 Venu 30%, Malli 10%, Bhavani 10%, Dhansekar 20%, Surendra 20%, jagathees 20% 1 Actions
09/01/2026 Jagatheswaran J Documentation Task #2913: Test Plan Development and Approvals testcase document update 4:00 In Progress Jagatheswaran J Chola Turbo 09/01/2026 11:32 AM Task 2 31/03/2026 24/12/2025 VenuM 50%, Neha 100%, Dhan40%, Greeshma 50%, Mallikar100% 4 Actions
09/01/2026 Bhavani M Design Task #3056: Schematic Design Modification controller PCB Schematic design Modification of microcontroller pcb 8:00 In Progress Bhavani M Gateway V2.1 09/01/2026 11:18 AM Task 2 31/03/2026 14/08/2025 Venu 30%, Malli 10%, Bhavani 10%, Dhansekar 20%, Surendra 20%, jagathees 20% 1 Actions
09/01/2026 Thomas Joseph redmine review/ update Task #3037: Project Planning and Review Task/Resource allocation, Time log 0:45 Resolved Thomas Joseph Chola Turbo 09/01/2026 11:01 AM Task 2 31/03/2026 24/12/2025 VenuM 50%, Neha 100%, Dhan40%, Greeshma 50%, Mallikar100% 4 Actions
09/01/2026 Thomas Joseph redmine review/ update Task #3039: Project Planning and Review Task/Resource allocation, Time log 0:30 In Progress Thomas Joseph mDAQ4-1(Mid Range mDAQ)-Pilot 09/01/2026 11:00 AM Task 2 30/04/2026 02/01/2026 Thomas(20%), Venumadhav(100%),Dhilip(20%) 3 Actions
09/01/2026 Thomas Joseph Meeting Task #3038: Project Planning and Review Planning and Review 0:45 In Progress Thomas Joseph mTracker(Mid Range GW)-Pilot 09/01/2026 10:55 AM Task 2 30/04/2026 02/01/2026 Thomas(20%), Venumadhav(100%),Dhilip(20%) 3 Actions
09/01/2026 Thomas Joseph Meeting Task #3039: Project Planning and Review Planning and Review 1:00 In Progress Thomas Joseph mDAQ4-1(Mid Range mDAQ)-Pilot 09/01/2026 10:54 AM Task 2 30/04/2026 02/01/2026 Thomas(20%), Venumadhav(100%),Dhilip(20%) 3 Actions
09/01/2026 Thomas Joseph Meeting Task #3037: Project Planning and Review Critical Project Update call 1:10 Resolved Thomas Joseph Chola Turbo 09/01/2026 10:52 AM Task 2 31/03/2026 24/12/2025 VenuM 50%, Neha 100%, Dhan40%, Greeshma 50%, Mallikar100% 4 Actions
09/01/2026 Dhanasekar T Procurement Task #2939: Enclosure Procurement Done 0:06 Resolved Dhanasekar T Chola Turbo 09/01/2026 07:54 AM Task 2 31/03/2026 24/12/2025 VenuM 50%, Neha 100%, Dhan40%, Greeshma 50%, Mallikar100% 4 Actions
09/01/2026 Thomas Joseph Meeting Task #2928: Testing of PLCIO Stacked boards with CTB platform Team review meeting 0:30 Resolved Thomas Joseph mDAQ4-1(Mid Range mDAQ)-Pilot 09/01/2026 07:04 AM Task 2 30/04/2026 02/01/2026 Thomas(20%), Venumadhav(100%),Dhilip(20%) 3 Actions
09/01/2026 Dhanasekar T Procurement Task #2962: IO PCB Fabrication Quotation received and PR created 0:30 Resolved Dhanasekar T mTracker(Mid Range GW)-Pilot 09/01/2026 06:28 AM Task 2 30/04/2026 02/01/2026 Thomas(20%), Venumadhav(100%),Dhilip(20%) 3 Actions
09/01/2026 Dhanasekar T Procurement Task #2936: Enclosure Procurement Procurement done 0:06 Resolved Dhanasekar T mTracker(Mid Range GW)-Pilot 09/01/2026 06:27 AM Task 2 30/04/2026 02/01/2026 Thomas(20%), Venumadhav(100%),Dhilip(20%) 3 Actions
09/01/2026 Dhanasekar T Procurement Task #2940: Enclosure fabrication Enclosure moved to fabricator 0:30 Resolved Dhanasekar T mTracker(Mid Range GW)-Pilot 09/01/2026 06:25 AM Task 2 30/04/2026 02/01/2026 Thomas(20%), Venumadhav(100%),Dhilip(20%) 3 Actions
09/01/2026 Dhanasekar T PCB assembly Task #2997: GW 2.0 PCB Assembly Components sent to uV for assembly 0:30 Resolved Dhanasekar T mDAQ4-1(Mid Range mDAQ)-Pilot 09/01/2026 06:22 AM Task 2 30/04/2026 02/01/2026 Thomas(20%), Venumadhav(100%),Dhilip(20%) 3 Actions
09/01/2026 Thomas Joseph Documentation Task #2964: Product Requirements Product spec. document : Reviewed comments, formated and baselined 0:30 Resolved Thomas Joseph mTracker(Mid Range GW)-Pilot 09/01/2026 06:20 AM Task 2 30/04/2026 02/01/2026 Thomas(20%), Venumadhav(100%),Dhilip(20%) 3 Actions
09/01/2026 Dhanasekar T Procurement Task #2996: GW 2.0 PCB Fabrication Process going on middle stage(40-80%) 0:06 Resolved Dhanasekar T mDAQ4-1(Mid Range mDAQ)-Pilot 09/01/2026 06:20 AM Task 2 30/04/2026 02/01/2026 Thomas(20%), Venumadhav(100%),Dhilip(20%) 3 Actions
09/01/2026 Dhanasekar T Procurement Task #2961: USB PCB Fabrication Quotation received and PR created 2:00 Resolved Dhanasekar T Chola Turbo 09/01/2026 06:18 AM Task 2 31/03/2026 24/12/2025 VenuM 50%, Neha 100%, Dhan40%, Greeshma 50%, Mallikar100% 4 Actions
09/01/2026 Dhanasekar T Procurement Task #2938: Enclosure fabrication Enclosure moved to fabricator 1:00 Resolved Dhanasekar T Chola Turbo 09/01/2026 06:17 AM Task 2 31/03/2026 24/12/2025 VenuM 50%, Neha 100%, Dhan40%, Greeshma 50%, Mallikar100% 4 Actions
09/01/2026 Dhanasekar T Procurement Task #2939: Enclosure Procurement Procurement done 1:00 Resolved Dhanasekar T Chola Turbo 09/01/2026 06:14 AM Task 2 31/03/2026 24/12/2025 VenuM 50%, Neha 100%, Dhan40%, Greeshma 50%, Mallikar100% 4 Actions
09/01/2026 Sumanth D Testing Task #2930: Test PLCIO with CTB application Testing 3:00 Resolved Sumanth D mDAQ4-1(Mid Range mDAQ)-Pilot 09/01/2026 05:55 AM Task 2 30/04/2026 02/01/2026 Thomas(20%), Venumadhav(100%),Dhilip(20%) 3 Actions
09/01/2026 Channamallikarjuna Mattihalli Support Task #2968: SW-Development Request to Assign Task 2968 and Subtasks 1:00 In Progress Channamallikarjuna Mattihalli mTracker(Mid Range GW)-Pilot 09/01/2026 04:52 AM Task 2 30/04/2026 02/01/2026 Thomas(20%), Venumadhav(100%),Dhilip(20%) 3 Actions
08/01/2026 Thomas Joseph Design Task #2984: Preliminary Design Arctitecture Study 1:00 In Progress Thomas Joseph mDAQ4-1(Mid Range mDAQ)-Pilot 08/01/2026 03:04 PM Task 2 30/04/2026 02/01/2026 Thomas(20%), Venumadhav(100%),Dhilip(20%) 3 Actions
08/01/2026 Thomas Joseph Design Task #2883: HW Design Review H/w design review 1:00 New Thomas Joseph Gateway V2 08/01/2026 03:00 PM Task 2 31/03/2026 18/06/2025 Channa 100%, VenuM 30%, Greeshma 30%, Gowri 20%, Bhavani 50% 2 Actions
08/01/2026 Thomas Joseph Design Task #3040: Design of Enclosure Graphics(Sticker/Screenprint) review 0:15 Resolved Thomas Joseph Chola Turbo 08/01/2026 02:35 PM Task 2 31/03/2026 24/12/2025 VenuM 50%, Neha 100%, Dhan40%, Greeshma 50%, Mallikar100% 4 Actions
08/01/2026 Thomas Joseph Design Task #3017: Design of Enclosure Graphics(Sticker/Screenprint) review 0:15 Resolved Thomas Joseph mTracker(Mid Range GW)-Pilot 08/01/2026 02:34 PM Task 2 30/04/2026 02/01/2026 Thomas(20%), Venumadhav(100%),Dhilip(20%) 3 Actions
08/01/2026 Thomas Joseph Meeting Task #2935: Procurement Procurement Review 0:30 Resolved Thomas Joseph mTracker(Mid Range GW)-Pilot 08/01/2026 02:09 PM Task 2 30/04/2026 02/01/2026 Thomas(20%), Venumadhav(100%),Dhilip(20%) 3 Actions
08/01/2026 Thomas Joseph Design Task #2934: Detailed Design PCB Design Review 2:00 In Progress Thomas Joseph mTracker(Mid Range GW)-Pilot 08/01/2026 02:00 PM Task 2 30/04/2026 02/01/2026 Thomas(20%), Venumadhav(100%),Dhilip(20%) 3 Actions
08/01/2026 Thomas Joseph Documentation Task #2911: PLC MODBUS mapping from Chola on Siemens PLC customer requirement documentation 0:15 In Progress Thomas Joseph Chola Turbo 08/01/2026 01:58 PM Task 2 31/03/2026 24/12/2025 VenuM 50%, Neha 100%, Dhan40%, Greeshma 50%, Mallikar100% 4 Actions
08/01/2026 Sumanth D Testing Task #2928: Testing of PLCIO Stacked boards with CTB platform Testing PLCIO PCB's 8:00 Resolved Sumanth D mDAQ4-1(Mid Range mDAQ)-Pilot 08/01/2026 01:38 PM Task 2 30/04/2026 02/01/2026 Thomas(20%), Venumadhav(100%),Dhilip(20%) 3 Actions
08/01/2026 Thomas Joseph redmine review/ update Task #3039: Project Planning and Review Planning and Review 0:30 In Progress Thomas Joseph mDAQ4-1(Mid Range mDAQ)-Pilot 08/01/2026 01:33 PM Task 2 30/04/2026 02/01/2026 Thomas(20%), Venumadhav(100%),Dhilip(20%) 3 Actions
08/01/2026 Thomas Joseph Meeting Task #3039: Project Planning and Review Review and steering meeting with DM 0:30 In Progress Thomas Joseph mDAQ4-1(Mid Range mDAQ)-Pilot 08/01/2026 01:32 PM Task 2 30/04/2026 02/01/2026 Thomas(20%), Venumadhav(100%),Dhilip(20%) 3 Actions
08/01/2026 Thomas Joseph Meeting Task #3039: Project Planning and Review Team review meeting 0:30 In Progress Thomas Joseph mDAQ4-1(Mid Range mDAQ)-Pilot 08/01/2026 01:31 PM Task 2 30/04/2026 02/01/2026 Thomas(20%), Venumadhav(100%),Dhilip(20%) 3 Actions
08/01/2026 Thomas Joseph Meeting Task #3038: Project Planning and Review Team review meeting 0:30 In Progress Thomas Joseph mTracker(Mid Range GW)-Pilot 08/01/2026 01:28 PM Task 2 30/04/2026 02/01/2026 Thomas(20%), Venumadhav(100%),Dhilip(20%) 3 Actions
08/01/2026 Thomas Joseph Meeting Task #3038: Project Planning and Review Review and steering meeting with DM 0:30 In Progress Thomas Joseph mTracker(Mid Range GW)-Pilot 08/01/2026 01:27 PM Task 2 30/04/2026 02/01/2026 Thomas(20%), Venumadhav(100%),Dhilip(20%) 3 Actions
08/01/2026 Thomas Joseph redmine review/ update Task #3038: Project Planning and Review Planning and Review 0:30 In Progress Thomas Joseph mTracker(Mid Range GW)-Pilot 08/01/2026 01:25 PM Task 2 30/04/2026 02/01/2026 Thomas(20%), Venumadhav(100%),Dhilip(20%) 3 Actions
08/01/2026 Prakash M Testing Task #2930: Test PLCIO with CTB application AI value has been gotten with PLC_IO controller. DI,DO verification with PLC_IO controller is in process. 6:00 Resolved Prakash M mDAQ4-1(Mid Range mDAQ)-Pilot 08/01/2026 01:21 PM Task 2 30/04/2026 02/01/2026 Thomas(20%), Venumadhav(100%),Dhilip(20%) 3 Actions
08/01/2026 Thomas Joseph redmine review/ update Task #3037: Project Planning and Review Planning and Review 0:30 Resolved Thomas Joseph Chola Turbo 08/01/2026 01:20 PM Task 2 31/03/2026 24/12/2025 VenuM 50%, Neha 100%, Dhan40%, Greeshma 50%, Mallikar100% 4 Actions
08/01/2026 Dhanasekar T Documentation Task #2958: Product Requirements Screen printing attached 0:06 Resolved Dhanasekar T Chola Turbo 08/01/2026 12:35 PM Task 2 31/03/2026 24/12/2025 VenuM 50%, Neha 100%, Dhan40%, Greeshma 50%, Mallikar100% 4 Actions
08/01/2026 Jagatheswaran J Testing Task #2913: Test Plan Development and Approvals Test case document preparation based on the CSR document. 8:00 In Progress Jagatheswaran J Chola Turbo 08/01/2026 11:24 AM Task 2 31/03/2026 24/12/2025 VenuM 50%, Neha 100%, Dhan40%, Greeshma 50%, Mallikar100% 4 Actions
08/01/2026 Channamallikarjuna Mattihalli Development Task #2954: TCP Over 4G 4G 8:00 Resolved Channamallikarjuna Mattihalli Chola Turbo 08/01/2026 09:41 AM Task 2 31/03/2026 24/12/2025 VenuM 50%, Neha 100%, Dhan40%, Greeshma 50%, Mallikar100% 4 Actions
08/01/2026 Channamallikarjuna Mattihalli Development Task #2954: TCP Over 4G 4G TCP 8:00 Resolved Channamallikarjuna Mattihalli Chola Turbo 08/01/2026 09:40 AM Task 2 31/03/2026 24/12/2025 VenuM 50%, Neha 100%, Dhan40%, Greeshma 50%, Mallikar100% 4 Actions
08/01/2026 Channamallikarjuna Mattihalli Development Task #2954: TCP Over 4G 4G TCP 8:00 Resolved Channamallikarjuna Mattihalli Chola Turbo 08/01/2026 09:39 AM Task 2 31/03/2026 24/12/2025 VenuM 50%, Neha 100%, Dhan40%, Greeshma 50%, Mallikar100% 4 Actions
08/01/2026 Dhanasekar T Procurement Task #2996: GW 2.0 PCB Fabrication Prcoess going on 0:30 Resolved Dhanasekar T mDAQ4-1(Mid Range mDAQ)-Pilot 08/01/2026 07:55 AM Task 2 30/04/2026 02/01/2026 Thomas(20%), Venumadhav(100%),Dhilip(20%) 3 Actions
(301-400/420)