Project

General

Profile

Spent time

Filters

Apply Clear

Hours: 1272:37

Date User Activity Issue Comment Hours Status Author Project Created Target version Tracker Week Category Finish Date Start Date Engr, %effort Team_Size Severity
29/04/2026 Channamallikarjuna Mattihalli Bug fixes Task #2952: Embedded SW-Development Device is running in the client place 8:00 Resolved Channamallikarjuna Mattihalli Chola Turbo 29/04/2026 04:26 AM Task 18 31/03/2026 24/12/2025 VenuM 50%, Neha 100%, Dhan40%, Greeshma 50%, Mallikar100% 4 Actions
09/04/2026 Jagatheswaran J Testing Task #2913: Test Plan Development and Approvals monitoring the device continue data posting. 8:00 In Progress Jagatheswaran J Chola Turbo 09/04/2026 12:35 PM Task 15 31/03/2026 24/12/2025 VenuM 50%, Neha 100%, Dhan40%, Greeshma 50%, Mallikar100% 4 Actions
07/04/2026 Jagatheswaran J Testing Task #2913: Test Plan Development and Approvals monitoring the device continue data posting. 8:00 In Progress Jagatheswaran J Chola Turbo 07/04/2026 12:52 PM Task 15 31/03/2026 24/12/2025 VenuM 50%, Neha 100%, Dhan40%, Greeshma 50%, Mallikar100% 4 Actions
06/04/2026 Channamallikarjuna Mattihalli Development Task #2953: Modbus-TCP Modbus TCP working fine 8:00 Resolved Channamallikarjuna Mattihalli Chola Turbo 06/04/2026 05:27 AM Task 15 31/03/2026 24/12/2025 VenuM 50%, Neha 100%, Dhan40%, Greeshma 50%, Mallikar100% 4 Actions
06/04/2026 Channamallikarjuna Mattihalli Development Task #3032: GW2.0 Codebase readiness(Release 1.0) Modbus TCP, RTU, USB and Config packet is working fine 8:00 Resolved Channamallikarjuna Mattihalli Chola Turbo 06/04/2026 05:25 AM Task 15 31/03/2026 24/12/2025 VenuM 50%, Neha 100%, Dhan40%, Greeshma 50%, Mallikar100% 4 Actions
31/03/2026 Sumanth D Mechanical Assembly Task #3240: Panel Assembly Manual (for Customer ) labeling 1:00 In Progress Sumanth D mDAQ4-1(Mid Range mDAQ)-Pilot 31/03/2026 11:47 AM Task 14 30/04/2026 02/01/2026 Thomas(20%), Venumadhav(100%),Dhilip(20%) 3 Actions
27/03/2026 Bhavani M Design Task #3248: PCB Design PCB Design 1:00 In Progress Bhavani M mTracker(Mid Range GW)-Production 27/03/2026 02:18 PM Task 13 31/03/2026 02/01/2026 Thomas(30%), Venumadhav(100%),Dhilip(20%) 3 Actions
27/03/2026 Dhanasekar T Procurement Task #3125: GW BoM Component Procurement Order placed 0:06 In Progress Dhanasekar T mTracker(Mid Range GW)-Production 27/03/2026 11:54 AM Task 13 31/03/2026 02/01/2026 Thomas(30%), Venumadhav(100%),Dhilip(20%) 3 Actions
27/03/2026 Dhanasekar T Mechanical Assembly Task #2998: Assembly Assembly completed 0:06 Resolved Dhanasekar T mDAQ4-1(Mid Range mDAQ)-Pilot 27/03/2026 11:47 AM Task 13 30/04/2026 02/01/2026 Thomas(20%), Venumadhav(100%),Dhilip(20%) 3 Actions
24/03/2026 Bhavani M Design Task #3248: PCB Design PCB designing 8:00 In Progress Bhavani M mTracker(Mid Range GW)-Production 24/03/2026 02:41 PM Task 13 31/03/2026 02/01/2026 Thomas(30%), Venumadhav(100%),Dhilip(20%) 3 Actions
24/03/2026 Dhanasekar T Procurement Task #3220: PLCIO BoM Component Procurement Paymenr done 0:06 In Progress Dhanasekar T mDAQ4-1(Mid Range mDAQ)-Production 24/03/2026 12:10 PM Task 13 31/03/2026 02/01/2026 Thomas(40%), Venumadhav(100%),Dhilip(20%) 3 Actions
24/03/2026 Dhanasekar T Procurement Task #3125: GW BoM Component Procurement TPD2E001DZDR-EOL 0:06 In Progress Dhanasekar T mTracker(Mid Range GW)-Production 24/03/2026 12:09 PM Task 13 31/03/2026 02/01/2026 Thomas(30%), Venumadhav(100%),Dhilip(20%) 3 Actions
23/03/2026 Dhanasekar T Procurement Task #3220: PLCIO BoM Component Procurement PLCIO BoM component 0:06 In Progress Dhanasekar T mDAQ4-1(Mid Range mDAQ)-Production 23/03/2026 09:03 AM Task 13 31/03/2026 02/01/2026 Thomas(40%), Venumadhav(100%),Dhilip(20%) 3 Actions
23/03/2026 Dhanasekar T Procurement Task #3125: GW BoM Component Procurement BoM components 0:06 In Progress Dhanasekar T mTracker(Mid Range GW)-Production 23/03/2026 09:01 AM Task 13 31/03/2026 02/01/2026 Thomas(30%), Venumadhav(100%),Dhilip(20%) 3 Actions
23/03/2026 Dhanasekar T Procurement Task #3003: Mechanical Assembly Done 0:06 Resolved Dhanasekar T mDAQ4-1(Mid Range mDAQ)-Pilot 23/03/2026 08:59 AM Task 13 30/04/2026 02/01/2026 Thomas(20%), Venumadhav(100%),Dhilip(20%) 3 Actions
23/03/2026 Dhanasekar T Procurement Task #2992: Procurement Done 0:06 Resolved Dhanasekar T mDAQ4-1(Mid Range mDAQ)-Pilot 23/03/2026 08:54 AM Task 13 30/04/2026 02/01/2026 Thomas(20%), Venumadhav(100%),Dhilip(20%) 3 Actions
23/03/2026 Dhanasekar T Mechanical Assembly Task #2969: Assembly Mechanical assembly done 0:06 Resolved Dhanasekar T mTracker(Mid Range GW)-Pilot 23/03/2026 08:53 AM Task 13 30/04/2026 02/01/2026 Thomas(20%), Venumadhav(100%),Dhilip(20%) 3 Actions
23/03/2026 Dhanasekar T Procurement Task #2935: Procurement Pilot version procurement completed 0:06 Resolved Dhanasekar T mTracker(Mid Range GW)-Pilot 23/03/2026 08:52 AM Task 13 30/04/2026 02/01/2026 Thomas(20%), Venumadhav(100%),Dhilip(20%) 3 Actions
18/03/2026 Channamallikarjuna Mattihalli Bug fixes Bug #3345: 4G Network Reconnection Issue 4G reconnect issue 8:00 In Progress Channamallikarjuna Mattihalli mDAQ4-1(Mid Range mDAQ)-Pilot 18/03/2026 06:45 AM Bug 12 30/04/2026 02/01/2026 Thomas(20%), Venumadhav(100%),Dhilip(20%) 3 Minor Actions
18/03/2026 Channamallikarjuna Mattihalli Bug fixes Bug #3341: 4G does not reconnect after SIM removal and reinsertion. Sim remove and insert back 8:00 Feedback Channamallikarjuna Mattihalli Chola Turbo 18/03/2026 06:39 AM Bug 12 31/03/2026 24/12/2025 VenuM 50%, Neha 100%, Dhan40%, Greeshma 50%, Mallikar100% 4 Minor Actions
17/03/2026 Jagatheswaran J Testing Task #2917: System Test Results and Reports monitoring the device . 8:00 Analysis Started Jagatheswaran J Chola Turbo 18/03/2026 09:27 AM Task 12 31/03/2026 24/12/2025 VenuM 50%, Neha 100%, Dhan40%, Greeshma 50%, Mallikar100% 4 Actions
16/03/2026 Jagatheswaran J Testing Task #2917: System Test Results and Reports Monitoring the device 9:00 Analysis Started Jagatheswaran J Chola Turbo 17/03/2026 07:48 AM Task 12 31/03/2026 24/12/2025 VenuM 50%, Neha 100%, Dhan40%, Greeshma 50%, Mallikar100% 4 Actions
16/03/2026 Bhavani M Testing Task #3157: GW2.0 PCB Testing GW2.0 PCB Testing 1:00 Resolved Bhavani M mDAQ4-1(Mid Range mDAQ)-Pilot 16/03/2026 01:25 PM Task 12 30/04/2026 02/01/2026 Thomas(20%), Venumadhav(100%),Dhilip(20%) 3 Actions
16/03/2026 Resmi K.V Design Task #3191: PCB Design Discussion with thomas sir and updating the PCB 8:00 In Progress Resmi K.V mDAQ4-1(Mid Range mDAQ)-Production 16/03/2026 01:20 PM Task 12 31/03/2026 02/01/2026 Thomas(40%), Venumadhav(100%),Dhilip(20%) 3 Actions
13/03/2026 Resmi K.V Design Task #3191: PCB Design PCB design 8:00 In Progress Resmi K.V mDAQ4-1(Mid Range mDAQ)-Production 13/03/2026 12:21 PM Task 11 31/03/2026 02/01/2026 Thomas(40%), Venumadhav(100%),Dhilip(20%) 3 Actions
13/03/2026 Dhanasekar T Procurement Task #2888: Enc Fab Completed 0:06 Resolved Dhanasekar T Gateway V2.1 13/03/2026 12:12 PM Task 11 31/03/2026 14/08/2025 Venu 30%, Malli 10%, Bhavani 10%, Dhansekar 20%, Surendra 20%, jagathees 20% 1 Actions
13/03/2026 Channamallikarjuna Mattihalli Design Task #3244: E-REMOS Configuration for mDAQ Functional Testing Done by Devipriya 8:00 In Progress Channamallikarjuna Mattihalli mDAQ4-1(Mid Range mDAQ)-Pilot 13/03/2026 10:00 AM Task 11 30/04/2026 02/01/2026 Thomas(20%), Venumadhav(100%),Dhilip(20%) 3 Actions
13/03/2026 Channamallikarjuna Mattihalli Development Task #3036: Application Integration of AI, DI & DO Done Integration 8:00 Resolved Channamallikarjuna Mattihalli mDAQ4-1(Mid Range mDAQ)-Pilot 13/03/2026 09:44 AM Task 11 30/04/2026 02/01/2026 Thomas(20%), Venumadhav(100%),Dhilip(20%) 3 Actions
13/03/2026 Channamallikarjuna Mattihalli Development Task #3036: Application Integration of AI, DI & DO Combined the code 8:00 Resolved Channamallikarjuna Mattihalli mDAQ4-1(Mid Range mDAQ)-Pilot 13/03/2026 09:44 AM Task 11 30/04/2026 02/01/2026 Thomas(20%), Venumadhav(100%),Dhilip(20%) 3 Actions
13/03/2026 Channamallikarjuna Mattihalli Development Task #3043: GW2.0 Codebase readiness(Release 1.0) Gateway V2 - E54 Development done for the following peripherals and Tested 8:00 In Progress Channamallikarjuna Mattihalli mDAQ4-1(Mid Range mDAQ)-Pilot 13/03/2026 09:42 AM Task 11 30/04/2026 02/01/2026 Thomas(20%), Venumadhav(100%),Dhilip(20%) 3 Actions
13/03/2026 Channamallikarjuna Mattihalli Development Task #3255: Modbus TCP Modbus TCP implemented and tested 8:00 Resolved Channamallikarjuna Mattihalli mDAQ4-1(Mid Range mDAQ)-Pilot 13/03/2026 09:37 AM Task 11 30/04/2026 02/01/2026 Thomas(20%), Venumadhav(100%),Dhilip(20%) 3 Actions
13/03/2026 Channamallikarjuna Mattihalli Development Task #3255: Modbus TCP Modbus TCP to read PLC data 8:00 Resolved Channamallikarjuna Mattihalli mDAQ4-1(Mid Range mDAQ)-Pilot 13/03/2026 09:36 AM Task 11 30/04/2026 02/01/2026 Thomas(20%), Venumadhav(100%),Dhilip(20%) 3 Actions
10/03/2026 Thomas Joseph Support Task #3239: Installation Support Installation at Customer Site 9:00 In Progress Thomas Joseph Chola Turbo 18/03/2026 06:14 AM Task 11 31/03/2026 24/12/2025 VenuM 50%, Neha 100%, Dhan40%, Greeshma 50%, Mallikar100% 4 Actions
05/03/2026 Resmi K.V Design Task #3191: PCB Design PCB design 8:00 In Progress Resmi K.V mDAQ4-1(Mid Range mDAQ)-Production 05/03/2026 12:37 PM Task 10 31/03/2026 02/01/2026 Thomas(40%), Venumadhav(100%),Dhilip(20%) 3 Actions
04/03/2026 Jagatheswaran J Testing Task #2917: System Test Results and Reports device testing 8:00 Analysis Started Jagatheswaran J Chola Turbo 06/03/2026 07:18 AM Task 10 31/03/2026 24/12/2025 VenuM 50%, Neha 100%, Dhan40%, Greeshma 50%, Mallikar100% 4 Actions
03/03/2026 Resmi K.V Design Task #3191: PCB Design PCB design 6:00 In Progress Resmi K.V mDAQ4-1(Mid Range mDAQ)-Production 03/03/2026 11:19 AM Task 10 31/03/2026 02/01/2026 Thomas(40%), Venumadhav(100%),Dhilip(20%) 3 Actions
02/03/2026 Resmi K.V Design Task #3191: PCB Design PCB design 8:00 In Progress Resmi K.V mDAQ4-1(Mid Range mDAQ)-Production 02/03/2026 01:21 PM Task 10 31/03/2026 02/01/2026 Thomas(40%), Venumadhav(100%),Dhilip(20%) 3 Actions
27/02/2026 Resmi K.V Design Task #3191: PCB Design PCB design 8:00 In Progress Resmi K.V mDAQ4-1(Mid Range mDAQ)-Production 27/02/2026 01:56 PM Task 9 31/03/2026 02/01/2026 Thomas(40%), Venumadhav(100%),Dhilip(20%) 3 Actions
27/02/2026 Bhavani M Testing Task #3157: GW2.0 PCB Testing PCB testing 8:00 Resolved Bhavani M mDAQ4-1(Mid Range mDAQ)-Pilot 27/02/2026 07:13 AM Task 9 30/04/2026 02/01/2026 Thomas(20%), Venumadhav(100%),Dhilip(20%) 3 Actions
26/02/2026 Resmi K.V Design Task #3191: PCB Design PCB design 8:00 In Progress Resmi K.V mDAQ4-1(Mid Range mDAQ)-Production 26/02/2026 02:14 PM Task 9 31/03/2026 02/01/2026 Thomas(40%), Venumadhav(100%),Dhilip(20%) 3 Actions
26/02/2026 Surendra Naik cable assembly Task #3261: RTU Cable for DI, DO, AI cable assembly for RTU 8:00 In Progress Surendra Naik mDAQ4-1(Mid Range mDAQ)-Pilot 26/02/2026 12:24 PM Task 9 30/04/2026 02/01/2026 Thomas(20%), Venumadhav(100%),Dhilip(20%) 3 Actions
25/02/2026 Resmi K.V Design Task #3191: PCB Design PCB design 6:00 In Progress Resmi K.V mDAQ4-1(Mid Range mDAQ)-Production 25/02/2026 11:57 AM Task 9 31/03/2026 02/01/2026 Thomas(40%), Venumadhav(100%),Dhilip(20%) 3 Actions
25/02/2026 Sumanth D Testing Task #3035: DO Module DO testing 1:00 Resolved Sumanth D mDAQ4-1(Mid Range mDAQ)-Pilot 25/02/2026 11:55 AM Task 9 30/04/2026 02/01/2026 Thomas(20%), Venumadhav(100%),Dhilip(20%) 3 Actions
25/02/2026 Sumanth D Testing Task #3033: AI Module AI testing 1:00 Resolved Sumanth D mDAQ4-1(Mid Range mDAQ)-Pilot 25/02/2026 11:53 AM Task 9 30/04/2026 02/01/2026 Thomas(20%), Venumadhav(100%),Dhilip(20%) 3 Actions
25/02/2026 Sumanth D Testing Task #3034: DI Module DI testing 1:00 Resolved Sumanth D mDAQ4-1(Mid Range mDAQ)-Pilot 25/02/2026 06:01 AM Task 9 30/04/2026 02/01/2026 Thomas(20%), Venumadhav(100%),Dhilip(20%) 3 Actions
25/02/2026 Sumanth D Testing Task #3034: DI Module DI testing 1:00 Resolved Sumanth D mDAQ4-1(Mid Range mDAQ)-Pilot 25/02/2026 05:59 AM Task 9 30/04/2026 02/01/2026 Thomas(20%), Venumadhav(100%),Dhilip(20%) 3 Actions
24/02/2026 Resmi K.V Design Task #3191: PCB Design PCB design 7:00 In Progress Resmi K.V mDAQ4-1(Mid Range mDAQ)-Production 24/02/2026 02:15 PM Task 9 31/03/2026 02/01/2026 Thomas(40%), Venumadhav(100%),Dhilip(20%) 3 Actions
24/02/2026 Sumanth D Testing Task #3034: DI Module DI testing 8:00 Resolved Sumanth D mDAQ4-1(Mid Range mDAQ)-Pilot 24/02/2026 02:04 PM Task 9 30/04/2026 02/01/2026 Thomas(20%), Venumadhav(100%),Dhilip(20%) 3 Actions
24/02/2026 Jagatheswaran J Testing Task #3041: Test Plan Development and Approvals testing 4:00 In Progress Jagatheswaran J mTracker(Mid Range GW)-Pilot 24/02/2026 12:57 PM Task 9 30/04/2026 02/01/2026 Thomas(20%), Venumadhav(100%),Dhilip(20%) 3 Actions
24/02/2026 Jagatheswaran J Testing Task #2917: System Test Results and Reports device testing 4:00 Analysis Started Jagatheswaran J Chola Turbo 24/02/2026 12:38 PM Task 9 31/03/2026 24/12/2025 VenuM 50%, Neha 100%, Dhan40%, Greeshma 50%, Mallikar100% 4 Actions
23/02/2026 Resmi K.V Design Task #3191: PCB Design Schematic updation 8:00 In Progress Resmi K.V mDAQ4-1(Mid Range mDAQ)-Production 23/02/2026 01:38 PM Task 9 31/03/2026 02/01/2026 Thomas(40%), Venumadhav(100%),Dhilip(20%) 3 Actions
20/02/2026 Thomas Joseph Development Task #3248: PCB Design Design review and Support (RKV) 2:00 In Progress Thomas Joseph mTracker(Mid Range GW)-Production 20/02/2026 04:05 PM Task 8 31/03/2026 02/01/2026 Thomas(30%), Venumadhav(100%),Dhilip(20%) 3 Actions
20/02/2026 Thomas Joseph Development Task #3039: Project Planning and Review Planning and Review(Discussion with Bhavani) 1:00 In Progress Thomas Joseph mDAQ4-1(Mid Range mDAQ)-Pilot 20/02/2026 04:03 PM Task 8 30/04/2026 02/01/2026 Thomas(20%), Venumadhav(100%),Dhilip(20%) 3 Actions
20/02/2026 Thomas Joseph Development Task #3034: DI Module Discussion on plan & review 0:30 Resolved Thomas Joseph mDAQ4-1(Mid Range mDAQ)-Pilot 20/02/2026 04:01 PM Task 8 30/04/2026 02/01/2026 Thomas(20%), Venumadhav(100%),Dhilip(20%) 3 Actions
20/02/2026 Bhavani M Testing Task #3157: GW2.0 PCB Testing PCB Testing 8:00 Resolved Bhavani M mDAQ4-1(Mid Range mDAQ)-Pilot 20/02/2026 02:18 PM Task 8 30/04/2026 02/01/2026 Thomas(20%), Venumadhav(100%),Dhilip(20%) 3 Actions
20/02/2026 Bhavani M Testing Task #3157: GW2.0 PCB Testing Visual Inspection 4:00 Resolved Bhavani M mDAQ4-1(Mid Range mDAQ)-Pilot 20/02/2026 02:11 PM Task 8 30/04/2026 02/01/2026 Thomas(20%), Venumadhav(100%),Dhilip(20%) 3 Actions
20/02/2026 Bhavani M Design Task #3248: PCB Design Ref des sorting 1:00 In Progress Bhavani M mTracker(Mid Range GW)-Production 20/02/2026 01:55 PM Task 8 31/03/2026 02/01/2026 Thomas(30%), Venumadhav(100%),Dhilip(20%) 3 Actions
20/02/2026 Sumanth D Testing Task #3033: AI Module test report 1:00 Resolved Sumanth D mDAQ4-1(Mid Range mDAQ)-Pilot 20/02/2026 09:06 AM Task 8 30/04/2026 02/01/2026 Thomas(20%), Venumadhav(100%),Dhilip(20%) 3 Actions
20/02/2026 Sumanth D Testing Task #3034: DI Module testing 5:00 Resolved Sumanth D mDAQ4-1(Mid Range mDAQ)-Pilot 20/02/2026 06:56 AM Task 8 30/04/2026 02/01/2026 Thomas(20%), Venumadhav(100%),Dhilip(20%) 3 Actions
20/02/2026 Sumanth D Testing Task #3033: AI Module testing 3:00 Resolved Sumanth D mDAQ4-1(Mid Range mDAQ)-Pilot 20/02/2026 06:53 AM Task 8 30/04/2026 02/01/2026 Thomas(20%), Venumadhav(100%),Dhilip(20%) 3 Actions
19/02/2026 Thomas Joseph Development Task #3033: AI Module Result Analysis 1:00 Resolved Thomas Joseph mDAQ4-1(Mid Range mDAQ)-Pilot 20/02/2026 04:00 PM Task 8 30/04/2026 02/01/2026 Thomas(20%), Venumadhav(100%),Dhilip(20%) 3 Actions
19/02/2026 Thomas Joseph Design Task #3191: PCB Design Design review and Support (RKV) 4:00 In Progress Thomas Joseph mDAQ4-1(Mid Range mDAQ)-Production 19/02/2026 03:31 PM Task 8 31/03/2026 02/01/2026 Thomas(40%), Venumadhav(100%),Dhilip(20%) 3 Actions
19/02/2026 Resmi K.V Design Task #3191: PCB Design Schematic updation 8:00 In Progress Resmi K.V mDAQ4-1(Mid Range mDAQ)-Production 19/02/2026 02:27 PM Task 8 31/03/2026 02/01/2026 Thomas(40%), Venumadhav(100%),Dhilip(20%) 3 Actions
19/02/2026 Surendra Naik PCB assembly Task #2979: Hardware Readiness GW mcu board testing & rework 4:00 In Progress Surendra Naik mTracker(Mid Range GW)-Pilot 19/02/2026 08:03 AM Task 8 30/04/2026 02/01/2026 Thomas(20%), Venumadhav(100%),Dhilip(20%) 3 Actions
18/02/2026 Thomas Joseph Meeting Task #3038: Project Planning and Review Critical Project Update call 1:10 In Progress Thomas Joseph mTracker(Mid Range GW)-Pilot 19/02/2026 03:40 PM Task 8 30/04/2026 02/01/2026 Thomas(20%), Venumadhav(100%),Dhilip(20%) 3 Actions
18/02/2026 Resmi K.V Design Task #3191: PCB Design Schematic updation 8:00 In Progress Resmi K.V mDAQ4-1(Mid Range mDAQ)-Production 18/02/2026 01:51 PM Task 8 31/03/2026 02/01/2026 Thomas(40%), Venumadhav(100%),Dhilip(20%) 3 Actions
18/02/2026 Surendra Naik cable assembly Task #3159: PLCIO Interface Cable PLCIO Interface Cable 2:00 Resolved Surendra Naik mDAQ4-1(Mid Range mDAQ)-Pilot 18/02/2026 12:07 PM Task 8 30/04/2026 02/01/2026 Thomas(20%), Venumadhav(100%),Dhilip(20%) 3 Actions
17/02/2026 Gowri G Development Task #3256: Data Storage on 4G Failure debuggibng the code 8:00 In Progress Gowri G mTracker(Mid Range GW)-Pilot 23/02/2026 06:43 AM Task 8 30/04/2026 02/01/2026 Thomas(20%), Venumadhav(100%),Dhilip(20%) 3 Actions
17/02/2026 Thomas Joseph Design Task #3191: PCB Design Design review and Support (RKV) 5:00 In Progress Thomas Joseph mDAQ4-1(Mid Range mDAQ)-Production 19/02/2026 03:49 PM Task 8 31/03/2026 02/01/2026 Thomas(40%), Venumadhav(100%),Dhilip(20%) 3 Actions
17/02/2026 Thomas Joseph Bug fixes Bug #3260: GW2.0 boards issue Board Issues Troubleshooting 2:00 Closed Thomas Joseph mTracker(Mid Range GW)-Pilot 19/02/2026 03:42 PM Bug 8 30/04/2026 02/01/2026 Thomas(20%), Venumadhav(100%),Dhilip(20%) 3 Critical Actions
17/02/2026 Resmi K.V Design Task #3191: PCB Design PCB design 8:00 In Progress Resmi K.V mDAQ4-1(Mid Range mDAQ)-Production 17/02/2026 02:25 PM Task 8 31/03/2026 02/01/2026 Thomas(40%), Venumadhav(100%),Dhilip(20%) 3 Actions
17/02/2026 DEVI PRIYAA Testing Task #3254: Modbus RTU Multiple slave id's is working 6:00 Resolved DEVI PRIYAA mTracker(Mid Range GW)-Pilot 17/02/2026 11:16 AM Task 8 30/04/2026 02/01/2026 Thomas(20%), Venumadhav(100%),Dhilip(20%) 3 Actions
16/02/2026 Gowri G Development Task #3256: Data Storage on 4G Failure Debugging the code for the sd not inialized properly 8:00 In Progress Gowri G mTracker(Mid Range GW)-Pilot 23/02/2026 06:38 AM Task 8 30/04/2026 02/01/2026 Thomas(20%), Venumadhav(100%),Dhilip(20%) 3 Actions
16/02/2026 Resmi K.V Design Task #3191: PCB Design Assigning footprint and component placement. 8:00 In Progress Resmi K.V mDAQ4-1(Mid Range mDAQ)-Production 17/02/2026 02:26 PM Task 8 31/03/2026 02/01/2026 Thomas(40%), Venumadhav(100%),Dhilip(20%) 3 Actions
16/02/2026 Thomas Joseph Testing Fix Bug #3260: GW2.0 boards issue Analysis and troubleshoot plan 0:45 Closed Thomas Joseph mTracker(Mid Range GW)-Pilot 16/02/2026 06:35 PM Bug 8 30/04/2026 02/01/2026 Thomas(20%), Venumadhav(100%),Dhilip(20%) 3 Critical Actions
16/02/2026 Thomas Joseph Design Task #3164: PCB Design review 1:00 In Progress Thomas Joseph mTracker(Mid Range GW)-Production 16/02/2026 06:31 PM Task 8 31/03/2026 02/01/2026 Thomas(30%), Venumadhav(100%),Dhilip(20%) 3 Actions
16/02/2026 Thomas Joseph O3 discussion Task #3222: Project Planning and Review Status meeting discussion on action items (VM) 0:30 In Progress Thomas Joseph mDAQ4-1(Mid Range mDAQ)-Production 16/02/2026 06:30 PM Task 8 31/03/2026 02/01/2026 Thomas(40%), Venumadhav(100%),Dhilip(20%) 3 Actions
16/02/2026 Thomas Joseph Design Task #3191: PCB Design Design of PLCIO PCB 6:00 In Progress Thomas Joseph mDAQ4-1(Mid Range mDAQ)-Production 16/02/2026 06:28 PM Task 8 31/03/2026 02/01/2026 Thomas(40%), Venumadhav(100%),Dhilip(20%) 3 Actions
16/02/2026 Jagatheswaran J Testing Task #3223: Test Plan Development and Approvals testcase document update 8:00 In Progress Jagatheswaran J mDAQ4-1(Mid Range mDAQ)-Production 16/02/2026 12:10 PM Task 8 31/03/2026 02/01/2026 Thomas(40%), Venumadhav(100%),Dhilip(20%) 3 Actions
16/02/2026 Dhanasekar T Procurement Task #3125: GW BoM Component Procurement Enquiry BoM costing quotation 0:30 In Progress Dhanasekar T mTracker(Mid Range GW)-Production 16/02/2026 06:59 AM Task 8 31/03/2026 02/01/2026 Thomas(30%), Venumadhav(100%),Dhilip(20%) 3 Actions
16/02/2026 Gowri G Development Task #3256: Data Storage on 4G Failure Done with the read and write of SD card- Data was stored in the SD card 16:00 In Progress Gowri G mTracker(Mid Range GW)-Pilot 16/02/2026 05:05 AM Task 8 30/04/2026 02/01/2026 Thomas(20%), Venumadhav(100%),Dhilip(20%) 3 Actions
14/02/2026 Thomas Joseph Bug fixes Bug #3259: Atmel ICE Debugger not detecting Atmel ICE Debugger troubleshooting 7:30 Closed Thomas Joseph mTracker(Mid Range GW)-Pilot 14/02/2026 04:06 PM Bug 7 30/04/2026 02/01/2026 Thomas(20%), Venumadhav(100%),Dhilip(20%) 3 Critical Actions
14/02/2026 Bhavani M Design Task #3248: PCB Design connector PCB routing 6:00 In Progress Bhavani M mTracker(Mid Range GW)-Production 14/02/2026 01:29 PM Task 7 31/03/2026 02/01/2026 Thomas(30%), Venumadhav(100%),Dhilip(20%) 3 Actions
13/02/2026 Bhavani M Design Task #3248: PCB Design PCB Routing 4:00 In Progress Bhavani M mTracker(Mid Range GW)-Production 13/02/2026 02:13 PM Task 7 31/03/2026 02/01/2026 Thomas(30%), Venumadhav(100%),Dhilip(20%) 3 Actions
13/02/2026 Jagatheswaran J Testing Task #3041: Test Plan Development and Approvals testcase document update 8:00 In Progress Jagatheswaran J mTracker(Mid Range GW)-Pilot 13/02/2026 12:59 PM Task 7 30/04/2026 02/01/2026 Thomas(20%), Venumadhav(100%),Dhilip(20%) 3 Actions
12/02/2026 Bhavani M Design Task #3247: Schematic Design Schematic Design 2:00 In Progress Bhavani M mTracker(Mid Range GW)-Production 12/02/2026 01:25 PM Task 7 31/03/2026 02/01/2026 Thomas(30%), Venumadhav(100%),Dhilip(20%) 3 Actions
11/02/2026 Dhanasekar T Procurement Task #3125: GW BoM Component Procurement BoM verification and costing preparation 4:00 In Progress Dhanasekar T mTracker(Mid Range GW)-Production 17/02/2026 06:37 AM Task 7 31/03/2026 02/01/2026 Thomas(30%), Venumadhav(100%),Dhilip(20%) 3 Actions
11/02/2026 Jagatheswaran J Testing Task #3041: Test Plan Development and Approvals testcase document update 8:00 In Progress Jagatheswaran J mTracker(Mid Range GW)-Pilot 13/02/2026 06:43 AM Task 7 30/04/2026 02/01/2026 Thomas(20%), Venumadhav(100%),Dhilip(20%) 3 Actions
11/02/2026 Resmi K.V Design Task #3164: PCB Design PCB design 8:00 In Progress Resmi K.V mTracker(Mid Range GW)-Production 11/02/2026 02:21 PM Task 7 31/03/2026 02/01/2026 Thomas(30%), Venumadhav(100%),Dhilip(20%) 3 Actions
11/02/2026 Thomas Joseph Meeting Task #3222: Project Planning and Review Discussion on Resource Allocation ( SV, VK, TJ) 2:00 In Progress Thomas Joseph mDAQ4-1(Mid Range mDAQ)-Production 11/02/2026 02:10 PM Task 7 31/03/2026 02/01/2026 Thomas(40%), Venumadhav(100%),Dhilip(20%) 3 Actions
11/02/2026 Thomas Joseph Meeting Task #3039: Project Planning and Review Critical Project Update call 1:10 In Progress Thomas Joseph mDAQ4-1(Mid Range mDAQ)-Pilot 11/02/2026 10:30 AM Task 7 30/04/2026 02/01/2026 Thomas(20%), Venumadhav(100%),Dhilip(20%) 3 Actions
11/02/2026 Thomas Joseph Development Task #2982: Customer Requirements Finalisation requirement analysis 0:30 In Progress Thomas Joseph mDAQ4-1(Mid Range mDAQ)-Pilot 11/02/2026 04:00 AM Task 7 30/04/2026 02/01/2026 Thomas(20%), Venumadhav(100%),Dhilip(20%) 3 Actions
10/02/2026 Thomas Joseph Support Task #3239: Installation Support TIA Software Uninstallation 0:30 In Progress Thomas Joseph Chola Turbo 11/02/2026 04:15 AM Task 7 31/03/2026 24/12/2025 VenuM 50%, Neha 100%, Dhan40%, Greeshma 50%, Mallikar100% 4 Actions
10/02/2026 Thomas Joseph Development Task #3154: Design and Development of Controller+4G(N58) PCB Design review and Support (RKV) 2:00 In Progress Thomas Joseph mTracker(Mid Range GW)-Production 11/02/2026 04:06 AM Task 7 31/03/2026 02/01/2026 Thomas(30%), Venumadhav(100%),Dhilip(20%) 3 Actions
10/02/2026 Thomas Joseph Meeting Task #2983: Product Requirements Customer meeting 0:30 Resolved Thomas Joseph mDAQ4-1(Mid Range mDAQ)-Pilot 11/02/2026 04:04 AM Task 7 30/04/2026 02/01/2026 Thomas(20%), Venumadhav(100%),Dhilip(20%) 3 Actions
10/02/2026 Thomas Joseph Meeting Task #3222: Project Planning and Review production plan review - PCB design (VK, SV, RKV, DT) 0:45 In Progress Thomas Joseph mDAQ4-1(Mid Range mDAQ)-Production 11/02/2026 04:04 AM Task 7 31/03/2026 02/01/2026 Thomas(40%), Venumadhav(100%),Dhilip(20%) 3 Actions
10/02/2026 Resmi K.V Documentation Task #3246: Interface PCB BoM BoM creation 1:00 Resolved Resmi K.V mTracker(Mid Range GW)-Production 10/02/2026 10:30 AM Task 7 31/03/2026 02/01/2026 Thomas(30%), Venumadhav(100%),Dhilip(20%) 3 Actions
10/02/2026 Resmi K.V Documentation Task #3247: Schematic Design Schematic PDF creation 0:30 In Progress Resmi K.V mTracker(Mid Range GW)-Production 10/02/2026 10:29 AM Task 7 31/03/2026 02/01/2026 Thomas(30%), Venumadhav(100%),Dhilip(20%) 3 Actions
10/02/2026 Thomas Joseph redmine review/ update Task #3120: Project Planning and Review Planning and Review 1:00 In Progress Thomas Joseph mTracker(Mid Range GW)-Production 10/02/2026 09:56 AM Task 7 31/03/2026 02/01/2026 Thomas(30%), Venumadhav(100%),Dhilip(20%) 3 Actions
10/02/2026 Resmi K.V Documentation Task #3126: Controller PCB BoM BoM creation 1:00 Resolved Resmi K.V mTracker(Mid Range GW)-Production 10/02/2026 09:14 AM Task 7 31/03/2026 02/01/2026 Thomas(30%), Venumadhav(100%),Dhilip(20%) 3 Actions
(1-100/382)

Also available in: CSV Atom