# Project Subject Status Assignee % Done Start date Due date Target version
3547 VAS Product Release 2.0 VAS integration and rendering New Jiban Munda

17/04/2026 VAS Product Release 2.0 - RHMS-ISTRAC Actions
3545 VAS Product Release 2.0 mDAQ3 faceplate screenprint Design New VenuMadhav S

15/04/2026 VAS Product Release 2.0 - Production-10 Units Actions
3544 VAS Product Release 2.0 mDAQ3 faceplate fabrication and Screenprinting New Dhanasekar T

15/04/2026 VAS Product Release 2.0 - Production-10 Units Actions
3543 VAS Product Release 2.0 mDAQ3 Faceplate Design New VenuMadhav S

15/04/2026 VAS Product Release 2.0 - Production-10 Units Actions
3542 VAS Product Release 2.0 mDAQ3 Interface PCB Assembly New Dhanasekar T

15/04/2026 VAS Product Release 2.0 - Production-10 Units Actions
3541 VAS Product Release 2.0 mDAQ3 Interface PCB Fabrication New Dhanasekar T

15/04/2026 VAS Product Release 2.0 - Production-10 Units Actions
3540 VAS Product Release 2.0 mDAQ3 Interface PCB Design New VenuMadhav S

15/04/2026 VAS Product Release 2.0 - Production-10 Units Actions
3528 mDAQ4-1(Mid Range mDAQ)-Pilot RTU data is not updating on the dashboard. New Greeshma Rayani

01/04/2026 Actions
3525 VAS Product Release 2.0 Communication Protocol Update In Progress Mohan Kashyap

30/03/2026 15/04/2026 VAS Product Release 2.0 - RHMS-ISTRAC Actions
3524 VAS Product Release 2.0 Delivery and Installation New Thomas Joseph

01/05/2026 02/05/2026 VAS Product Release 2.0 - BSH Actions
3523 VAS Product Release 2.0 System Testing New VenuMadhav S

VAS Product Release 2.0 - BSH Actions
3522 VAS Product Release 2.0 Report Generation New Jiban Munda

VAS Product Release 2.0 - BSH Actions
3521 VAS Product Release 2.0 VAS - Threshold Setting Resolved Jiban Munda

VAS Product Release 2.0 - BSH Actions
3520 VAS Product Release 2.0 Mechanical Fabrication New Dhanasekar T

20/04/2026 27/04/2026 VAS Product Release 2.0 - BSH Actions
3519 VAS Product Release 2.0 Mechanical Design New VenuMadhav S

18/04/2026 20/04/2026 VAS Product Release 2.0 - BSH Actions
3518 VAS Product Release 2.0 Preliminary Design New VenuMadhav S

31/03/2026 02/04/2026 VAS Product Release 2.0 - BSH Actions
3517 VAS Product Release 2.0 Procurement In Progress Dhanasekar T

31/03/2026 15/04/2026 VAS Product Release 2.0 - BSH Actions
3516 VAS Product Release 2.0 Parts list In Progress Dhanasekar T

31/03/2026 31/03/2026 VAS Product Release 2.0 - BSH Actions
3515 VAS Product Release 2.0 Customer Requirement Specification In Progress Thomas Joseph

26/03/2026 30/03/2026 VAS Product Release 2.0 - BSH Actions
3460 Gateway 3.0 Gerber Release New Bhavani M

02/04/2026 02/04/2026 Gateway 3.0 - GW3.0 Production Actions
3459 Gateway 3.0 Carrier board Brinfg-up New Dhilip Kumar R

07/04/2026 08/04/2026 Gateway 3.0 - KT-Release 1 Actions
3458 Gateway 3.0 N58 Production PCB GW3.0 BoM Procurement New Dhanasekar T

25/03/2026 01/04/2026 Gateway 3.0 - GW3.0 Production Actions
3457 Gateway 3.0 BoM In Progress Bhavani M

16/03/2026 25/03/2026 Gateway 3.0 - GW3.0 Production Actions
3456 VAS Product Release 2.0 Evaluate with two devices New Jiban Munda

VAS Product Release 2.0 - RHMS-ISTRAC Actions
3455 Gateway 3.0 Project Planning and Review In Progress Thomas Joseph

02/02/2026 30/04/2026 Actions
3453 Gateway 3.0 SMA connector replace N58 EVM In Progress Surendra Naik

20/03/2026 30/03/2026 Gateway 3.0 - KT-Release 1 Actions
3452 Gateway 3.0 Delivery Resolved Dhanasekar T

Gateway 3.0 - KT - Trial 1 Actions
3451 Gateway 3.0 Onsite Demo and installation New Gowri G

30/03/2026 Gateway 3.0 - KT - Trial 1 Actions
3450 VAS Product Release 2.0 mDAQ3 Parts List In Progress Dhanasekar T

VAS Product Release 2.0 - Production-10 Units Actions
3448 Gateway 3.0 Embedded Software Integration New Yoganand D

24/03/2026 10/04/2026 Gateway 3.0 - KT-Release 1 Actions
3447 Gateway 3.0 Signal List Generation New Yogesh Gowda

06/04/2026 08/04/2026 Gateway 3.0 - KT-Release 1 Actions
3446 Gateway 3.0 Storage Buffer New Bhumika R

06/04/2026 07/04/2026 Gateway 3.0 - KT-Release 1 Actions
3445 Gateway 3.0 Threads New Bhumika R

26/03/2026 03/04/2026 Gateway 3.0 - KT-Release 1 Actions
3444 Gateway 3.0 Socket programming New Yogesh Gowda

27/03/2026 03/04/2026 Gateway 3.0 - KT-Release 1 Actions
3443 Gateway 3.0 GPS Module New Yoganand D

06/04/2026 07/04/2026 Gateway 3.0 - KT-Release 1 Actions
3442 Gateway 3.0 GPIO Module New Bhumika R

18/03/2026 25/03/2026 Gateway 3.0 - KT-Release 1 Actions
3441 VAS Product Release 2.0 User Manual New Mohan Kashyap

30/03/2026 20/04/2026 VAS Product Release 2.0 - RHMS-ISTRAC Actions
3440 VAS Product Release 2.0 Device Calibration New Thomas Joseph

23/03/2026 31/03/2026 VAS Product Release 2.0 - RHMS-ISTRAC Actions
3439 VAS Product Release 2.0 Review of Test Results(Internal and External) New Thomas Joseph

23/03/2026 VAS Product Release 2.0 - RHMS-ISTRAC Actions
3438 VAS Product Release 2.0 Test Plan and Procedure New Thomas Joseph

VAS Product Release 2.0 - RHMS-ISTRAC Actions
3437 VAS Product Release 2.0 Customer Acceptance Test New Thomas Joseph

23/03/2026 VAS Product Release 2.0 - RHMS-ISTRAC Actions
3436 VAS Product Release 2.0 Pre-Installation Visit Analysis Done VenuMadhav S

26/03/2026 26/03/2026 VAS Product Release 2.0 - RHMS-ISTRAC Actions
3434 VAS Product Release 2.0 mDAQ3 PCB Fabrication In Progress Dhanasekar T

VAS Product Release 2.0 - Production-10 Units Actions
3432 VAS Product Release 2.0 Debug Console Interface New VenuMadhav S

22/03/2026 VAS Product Release 2.0 - RHMS-ISTRAC Actions
3431 VAS Product Release 2.0 LED Status Indication In Progress Mohan Kashyap

22/03/2026 17/04/2026 VAS Product Release 2.0 - RHMS-ISTRAC Actions
3430 VAS Product Release 2.0 Detailed Design - Revision New Mohan Kashyap

30/03/2026 20/04/2026 VAS Product Release 2.0 - RHMS-ISTRAC Actions
3429 VAS Product Release 2.0 Preliminary Design - Revision New Thomas Joseph

22/03/2026 VAS Product Release 2.0 - RHMS-ISTRAC Actions
3428 VAS Product Release 2.0 Customer Requirement Specification In Progress Thomas Joseph

20/02/2026 25/02/2026 VAS Product Release 2.0 - RHMS-ISTRAC Actions
3427 VAS Product Release 2.0 System Delivery New Dhanasekar T

30/04/2026 30/04/2026 VAS Product Release 2.0 - RHMS-ISTRAC Actions
3426 VAS Product Release 2.0 Customer Demo New Thomas Joseph

27/03/2026 27/03/2026 VAS Product Release 2.0 - RHMS-ISTRAC Actions
3423 VAS Product Release 2.0 Alert Notification Resolved Jiban Munda

VAS Product Release 2.0 - RHMS-ISTRAC Actions
3421 VAS Product Release 2.0 Temperture - VAS Application Integration New Jiban Munda

22/03/2026 VAS Product Release 2.0 - RHMS-ISTRAC Actions
3420 VAS Product Release 2.0 Analog Input-Embedded Software Hold Prakash M

25/03/2026 22/04/2026 VAS Product Release 2.0 - RHMS-ISTRAC Actions
3419 VAS Product Release 2.0 Analog Input - Hardware Integration New VenuMadhav S

22/03/2026 VAS Product Release 2.0 - RHMS-ISTRAC Actions
3418 VAS Product Release 2.0 Mechanical Assembly New VenuMadhav S

22/03/2026 VAS Product Release 2.0 - RHMS-ISTRAC Actions
3417 VAS Product Release 2.0 Faceplate Fabrication New Dhanasekar T

22/03/2026 VAS Product Release 2.0 - RHMS-ISTRAC Actions
3416 VAS Product Release 2.0 Faceplate Design New VenuMadhav S

22/03/2026 VAS Product Release 2.0 - RHMS-ISTRAC Actions
3415 VAS Product Release 2.0 Architecture Schematic New Thomas Joseph

22/03/2026 VAS Product Release 2.0 - RHMS-ISTRAC Actions
3414 VAS Product Release 2.0 mDAQ3 Customisation for ISTRAC New Mohan Kashyap

22/03/2026 VAS Product Release 2.0 - RHMS-ISTRAC Actions
3412 VAS Product Release 2.0 GMF and Sidebands New Jiban Munda

VAS Product Release 2.0 - RHMS-ISTRAC Actions
3410 VAS Product Release 2.0 Envelop Analysis New Jiban Munda

VAS Product Release 2.0 - RHMS-ISTRAC Actions
3409 VAS Product Release 2.0 Performance check with LAN In Progress VenuMadhav S

VAS Product Release 2.0 - RHMS-ISTRAC Actions
3408 mTracker(Mid Range GW)-Pilot Internal Demo Analysis Started Jagatheswaran J

27/02/2026 20/03/2026 Actions
3407 mDAQ4-1(Mid Range mDAQ)-Pilot Internal Demo Analysis Started Jagatheswaran J

27/02/2026 20/03/2026 Actions
3406 VAS Product Release 2.0 Add marker to graph and data in table New Jiban Munda

VAS Product Release 2.0 - Future Actions
3400 TPMS 2-Wheeler SWD detection fails/SPI Boot failure Feedback Sumanth D

10/02/2026 20/03/2026 Actions
3399 mTracker(Mid Range GW)-Pilot Sensor Testing New

13/03/2026 Actions
3398 CABS-VPX SBC Schematic Design Analysis Started Thomas Joseph

16/03/2026 17/03/2026 Actions
3397 CABS-VPX SBC Embedded Software Analysis Started Thomas Joseph

16/03/2026 Actions
3396 CABS-VPX SBC Bringup-Testing New Thomas Joseph

16/03/2026 Actions
3395 CABS-VPX SBC Procurement Analysis Started Thomas Joseph

16/03/2026 Actions
3394 CABS-VPX SBC Review of schematic Analysis Started Thomas Joseph

16/03/2026 17/03/2026 Actions
3392 VAS Product Release 2.0 Project Planning and Review In Progress Mohan Kashyap

01/01/2026 31/05/2026 Actions
3391 VAS Product Release 2.0 Temperature measurement New Thomas Joseph

22/03/2026 22/04/2026 VAS Product Release 2.0 - RHMS-ISTRAC Actions
3390 VAS Product Release 2.0 Testing New VenuMadhav S

16/03/2026 VAS Product Release 2.0 - Production-10 Units Actions
3389 VAS Product Release 2.0 Assembly New Dhanasekar T

16/03/2026 VAS Product Release 2.0 - Production-10 Units Actions
3388 VAS Product Release 2.0 Procurement In Progress Dhanasekar T

16/03/2026 VAS Product Release 2.0 - Production-10 Units Actions
3387 VAS Product Release 2.0 Assembly and Testing of 10 units New Dhanasekar T

16/03/2026 VAS Product Release 2.0 - Production-10 Units Actions
3386 VAS Product Release 2.0 Sync-ed acquisition with ext. trigger Resolved Mohan Kashyap

16/03/2026 15/04/2026 VAS Product Release 2.0 - RHMS-ISTRAC Actions
3383 VAS Product Release 2.0 Test for Turaround time Resolved Jiban Munda

16/03/2026 20/03/2026 VAS Product Release 2.0 - RHMS-ISTRAC Actions
3382 VAS Product Release 2.0 Persistency for VAS Configuration In Progress Shiva Leela

13/03/2026 23/04/2026 VAS Product Release 2.0 - Future Actions
3380 VAS Product Release 2.0 Hardware Readiness - Synchronous RPM Resolved VenuMadhav S

13/03/2026 16/03/2026 VAS Product Release 2.0 - RHMS-ISTRAC Actions
3379 Chola Turbo On the graph the values and labels are overlapping In Progress Bhanusri Pasupuleti

13/03/2026 18/03/2026 Actions
3378 VAS Product Release 2.0 SW Programming for programmable sampling Resolved Jiban Munda

13/03/2026 16/03/2026 VAS Product Release 2.0 - RHMS-ISTRAC Actions
3376 VAS Product Release 2.0 Configurable Sampling-Processing Resolved Mohan Kashyap

13/03/2026 16/03/2026 VAS Product Release 2.0 - RHMS-ISTRAC Actions
3372 VAS Product Release 2.0 Parts List In Progress Dhanasekar T

20/02/2026 13/03/2026 VAS Product Release 2.0 - RHMS-ISTRAC Actions
3371 VAS Product Release 2.0 Procurement Analysis Started Dhanasekar T

20/02/2026 20/03/2026 VAS Product Release 2.0 - RHMS-ISTRAC Actions
3369 VAS Product Release 2.0 Sync with RPM In Progress Mohan Kashyap

13/03/2026 18/03/2026 VAS Product Release 2.0 - RHMS-ISTRAC Actions
3368 VAS Product Release 2.0 Graph Validation on Desktop Application New Mohan Kashyap

25/03/2026 17/04/2026 VAS Product Release 2.0 - Future Actions
3367 VAS Product Release 2.0 Validate Data Posting as per the standards New Mohan Kashyap

25/03/2026 17/04/2026 VAS Product Release 2.0 - Future Actions
3366 Chola Turbo Training videos for Chola Analysis Started Prakash M

12/03/2026 Actions
3365 Chola Turbo Alarm Parameter naming convention per customer inputs Resolved Prakash M

12/03/2026 31/03/2026 Actions
3364 Chola Turbo Alarm Feedback trips : Test and validation Resolved Prakash M

11/03/2026 12/03/2026 Actions
3363 mTracker(Mid Range GW)-Pilot GPS Not Implemented-GPS functionality is not implemented in the current firmware. New Jagatheswaran J

11/03/2026 Actions
3361 mTracker(Mid Range GW)-Pilot LED not functioning as per the requirements In Progress Jagatheswaran J

09/03/2026 18/03/2026 Actions
3360 mTracker(Mid Range GW)-Pilot USB Config Tool : when the protocol is changed from RTU to TCP in the Modbus Config section No response In Progress Jagatheswaran J

09/03/2026 18/03/2026 Actions
3356 Gateway 3.0 Embedded SW-Development In Progress Yoganand D

09/03/2026 Gateway 3.0 - KT - Trial 1 Actions
3355 Gateway 3.0 TV3.0 Hardware Readiness Resolved Surendra Naik

02/03/2026 02/03/2026 Gateway 3.0 - KT - Trial 1 Actions
3354 Gateway 3.0 Phase 0B Resolved Gowri G

02/03/2026 30/03/2026 Gateway 3.0 - KT - Trial 1 Actions
3351 Chola Turbo USB Configuration Tool –Not working In Progress Jagatheswaran J

04/03/2026 18/03/2026 Actions