Estimated time: 878:00 Spent time: 3541:07

# Project Subject Status Assignee % Done Start date Due date Target version
3167 mTracker(Mid Range GW)-Pilot USB Configuration Tool(Revision) New Greeshma Rayani

19/01/2026 20/01/2026 Actions
3166 mTracker(Mid Range GW)-Production N58 Integration Resolved DEVI PRIYAA

29/01/2026 03/02/2026 Actions
3164 mTracker(Mid Range GW)-Production PCB Design In Progress VenuMadhav S

20/01/2026 11/02/2026 Actions
3163 mTracker(Mid Range GW)-Production Schematic Design In Progress Bhavani M

19/01/2026 19/01/2026 Actions
3162 mDAQ4-1(Mid Range mDAQ)-Pilot Programming Model Update Resolved Sumanth D

20/03/2026 23/03/2026 Actions
3161 mTracker(Mid Range GW)-Pilot Programming Model Update In Progress VenuMadhav S

19/01/2026 19/01/2026 Actions
3160 CABS-VPX SBC Project Planning and Review Analysis Started Thomas Joseph

05/09/2025 30/04/2026 Actions
3159 mDAQ4-1(Mid Range mDAQ)-Pilot PLCIO Interface Cable Resolved Surendra Naik

19/01/2026 19/01/2026 Actions
3158 mDAQ4-1(Mid Range mDAQ)-Pilot D-Sub 25 Cable Preparation Resolved Sumanth D

19/01/2026 22/01/2026 Actions
3157 mDAQ4-1(Mid Range mDAQ)-Pilot GW2.0 PCB Testing Resolved Bhavani M

23/03/2026 24/04/2026 Actions
3156 mDAQ4-1(Mid Range mDAQ)-Pilot Hardware Setup readiness for software development Resolved Dhilip Kumar R

20/03/2026 24/03/2026 Actions
3155 mTracker(Mid Range GW)-Production Design and Development of Interface PCB In Progress Bhavani M

02/02/2026 14/02/2026 Actions
3154 mTracker(Mid Range GW)-Production Design and Development of Controller+4G(N58) PCB In Progress VenuMadhav S

19/01/2026 11/02/2026 Actions
3153 mTracker(Mid Range GW)-Production Design of Enclosure Cutouts New VenuMadhav S

16/02/2026 17/02/2026 Actions
3151 mTracker(Mid Range GW)-Production Procurement Analysis Started Dhanasekar T

05/01/2026 17/03/2026 Actions
3150 mTracker(Mid Range GW)-Production Enclosure Procurement New Dhanasekar T

13/02/2026 13/02/2026 Actions
3149 mTracker(Mid Range GW)-Production Enclosure fabrication In Progress Dhanasekar T

18/02/2026 25/02/2026 Actions
3148 mTracker(Mid Range GW)-Production Controller PCB Fabrication New Dhanasekar T

16/02/2026 17/03/2026 Actions
3147 mTracker(Mid Range GW)-Production Review of Customer Requirements Analysis Started Venu Krishnamurthy

12/01/2026 21/01/2026 Actions
3146 mTracker(Mid Range GW)-Production Review of Product Requirements New Venu Krishnamurthy

12/01/2026 21/01/2026 Actions
3144 mTracker(Mid Range GW)-Production Wiring Diagram New VenuMadhav S

13/02/2026 17/02/2026 Actions
3143 mTracker(Mid Range GW)-Production E-REMOS Development New

Actions
3142 mTracker(Mid Range GW)-Production Embedded SW-Development New DEVI PRIYAA

29/01/2026 16/02/2026 Actions
3141 mTracker(Mid Range GW)-Production Assembly Analysis Started Dhanasekar T

12/02/2026 03/03/2026 Actions
3140 mTracker(Mid Range GW)-Production Parts List(Mech. Assembly) New Dhanasekar T

12/02/2026 13/02/2026 Actions
3139 mTracker(Mid Range GW)-Production Assembly Manual (Documentation) New VenuMadhav S

16/02/2026 20/02/2026 Actions
3138 mTracker(Mid Range GW)-Production Interface PCB Assembly New Surendra Naik

23/02/2026 24/02/2026 Actions
3137 mTracker(Mid Range GW)-Production Mechanical Assembly In Progress Dhanasekar T

02/03/2026 03/03/2026 Actions
3136 mTracker(Mid Range GW)-Production Testing Analysis Started VenuMadhav S

16/02/2026 31/03/2026 Actions
3135 mTracker(Mid Range GW)-Production Interfcae PCB Electrical Testing New VenuMadhav S

02/03/2026 02/03/2026 Actions
3134 mTracker(Mid Range GW)-Production AI Performance Testing New VenuMadhav S

02/03/2026 02/03/2026 Actions
3133 mTracker(Mid Range GW)-Production DI Performance Testing New VenuMadhav S

02/03/2026 02/03/2026 Actions
3132 mTracker(Mid Range GW)-Production System Testing New Jagatheswaran J

02/03/2026 31/03/2026 Actions
3131 mTracker(Mid Range GW)-Production Hardware Readiness New VenuMadhav S

05/02/2026 05/02/2026 Actions
3130 mTracker(Mid Range GW)-Production Customer Demo (Phase 2) New Venu Krishnamurthy

10/02/2026 10/02/2026 Actions
3129 mTracker(Mid Range GW)-Production Delivery (Phase 2) New Dhanasekar T

13/02/2026 13/02/2026 Actions
3127 mTracker(Mid Range GW)-Production Design of Enclosure Graphics(Sticker/Screenprint) New VenuMadhav S

16/02/2026 17/02/2026 Actions
3126 mTracker(Mid Range GW)-Production Controller PCB BoM Resolved Resmi K.V

09/02/2026 11/02/2026 Actions
3125 mTracker(Mid Range GW)-Production GW BoM Component Procurement In Progress Dhanasekar T

19/01/2026 20/02/2026 Actions
3124 mTracker(Mid Range GW)-Production GW2.0 Codebase readiness(Release 2.0) New DEVI PRIYAA

02/02/2026 16/02/2026 Actions
3120 mTracker(Mid Range GW)-Production Project Planning and Review In Progress Thomas Joseph

05/01/2026 30/06/2026 Actions
3119 mTracker(Mid Range GW)-Production Test Plan Development and Approvals New Jagatheswaran J

16/02/2026 23/02/2026 Actions
3118 mTracker(Mid Range GW)-Production Review/Update of GW2.0 Test Plan and Procedure New VenuMadhav S

23/02/2026 25/02/2026 Actions
3117 mTracker(Mid Range GW)-Production GW2.2 Functional Testing New VenuMadhav S

02/03/2026 02/03/2026 Actions
3115 mTracker(Mid Range GW)-Production Enclosure Screen Printing New Dhanasekar T

18/02/2026 25/02/2026 Actions
3071 Chola Turbo Enclosure Screen Printing Resolved Dhanasekar T

06/01/2026 16/01/2026 Actions
3070 mTracker(Mid Range GW)-Pilot Enclosure Screen Printing Resolved Dhanasekar T

06/01/2026 16/01/2026 Actions
3069 mTracker(Mid Range GW)-Production Preliminary Design In Progress Thomas Joseph

12/01/2026 23/01/2026 Actions
3065 Gateway V2.1 Routing Review New Bhavani M

09/01/2026 31/03/2026 Actions
3064 Gateway V2.1 Placement Review WiFi_4G PCB New Bhavani M

09/01/2026 Actions
3063 Gateway V2.1 Placement Review Controller PCB In Progress Bhavani M

09/01/2026 Actions
3062 Gateway V2.1 Connector PCB Routing Resolved Bhavani M

09/01/2026 Actions
3061 Gateway V2.1 WiFi_4G PCB Routing In Progress Bhavani M

09/01/2026 Actions
3060 Gateway V2.1 Controller PCB Routing In Progress Bhavani M

09/01/2026 Actions
3059 Gateway V2.1 PCB Design modification of WiFi_4G PCB In Progress Bhavani M

09/01/2026 Actions
3058 Gateway V2.1 PCB Design modification of Controller Resolved Bhavani M

31/10/2025 Actions
3057 Gateway V2.1 Schematic Design Modification WiFi_4G PCB In Progress Bhavani M

30/10/2025 Actions
3056 Gateway V2.1 Schematic Design Modification controller PCB In Progress Bhavani M

27/10/2025 Actions
3055 Gateway V2 USB stack integration Analysis Started Greeshma Rayani

07/01/2026 12/01/2026 Actions
3054 Chola Turbo USB Configuration Tool(Revision) Resolved Mucheli Rajendra

12/01/2026 20/01/2026 Actions
3053 Chola Turbo GUI Design and Development In Progress

02/01/2026 26/01/2026 Actions
3052 mDAQ4-1(Mid Range mDAQ)-Pilot Test Setup Resolved Dhilip Kumar R

20/03/2026 27/03/2026 Actions
3050 mTracker(Mid Range GW)-Pilot Test Setup Resolved VenuMadhav S

09/01/2026 14/01/2026 Actions
3049 Chola Turbo GW2.0 Functional Testing (Release 1.0) New Channamallikarjuna Mattihalli

02/01/2026 17/01/2026 Actions
3048 mTracker(Mid Range GW)-Pilot GW2.0 Functional Testing New VenuMadhav S

12/01/2026 14/01/2026 Actions
3047 mTracker(Mid Range GW)-Pilot Review/Update of GW2.0 Test Plan and Procedure Resolved VenuMadhav S

09/01/2026 13/01/2026 Actions
3046 mTracker(Mid Range GW)-Production Detailed Design Analysis Started Thomas Joseph

05/01/2026 17/02/2026 Actions
3045 mDAQ4-1(Mid Range mDAQ)-Production Detailed Design Analysis Started Thomas Joseph

05/01/2026 05/03/2026 GW 2.2 - GW 2.2 Design Actions
3044 TPMS 2-Wheeler PCB Fabrication (2W) Analysis Started Resmi K.V

08/01/2026 08/01/2026 Actions
3043 mDAQ4-1(Mid Range mDAQ)-Pilot GW2.0 Codebase readiness(Release 1.0) In Progress Channamallikarjuna Mattihalli

20/03/2026 02/04/2026 Actions
3042 mDAQ4-1(Mid Range mDAQ)-Pilot Test Plan Development and Approvals In Progress Jagatheswaran J

08/04/2026 15/04/2026 Actions
3041 mTracker(Mid Range GW)-Pilot Test Plan Development and Approvals In Progress Jagatheswaran J

12/01/2026 19/01/2026 Actions
3040 Chola Turbo Design of Enclosure Graphics(Sticker/Screenprint) Resolved VenuMadhav S

06/01/2026 06/01/2026 Actions
3039 mDAQ4-1(Mid Range mDAQ)-Pilot Project Planning and Review In Progress Thomas Joseph

30/12/2025 23/02/2026 Actions
3038 mTracker(Mid Range GW)-Pilot Project Planning and Review In Progress Thomas Joseph

30/12/2025 20/02/2026 Actions
3037 Chola Turbo Project Planning and Review Resolved Thomas Joseph

15/12/2025 27/01/2026 Actions
3036 mDAQ4-1(Mid Range mDAQ)-Pilot Application Integration of AI, DI & DO Resolved Channamallikarjuna Mattihalli

20/03/2026 22/04/2026 Actions
3035 mDAQ4-1(Mid Range mDAQ)-Pilot DO Module Resolved Sumanth D

20/03/2026 28/04/2026 Actions
3034 mDAQ4-1(Mid Range mDAQ)-Pilot DI Module Resolved Sumanth D

20/03/2026 07/04/2026 Actions
3033 mDAQ4-1(Mid Range mDAQ)-Pilot AI Module Resolved Sumanth D

20/03/2026 24/04/2026 Actions
3032 Chola Turbo GW2.0 Codebase readiness(Release 1.0) Resolved Channamallikarjuna Mattihalli

18/12/2025 06/02/2026 Actions
3031 mTracker(Mid Range GW)-Pilot Application Integration In Progress Greeshma Rayani

12/01/2026 11/02/2026 Actions
3030 mTracker(Mid Range GW)-Pilot AI Module Resolved Channamallikarjuna Mattihalli

09/01/2026 21/01/2026 Actions
3029 mTracker(Mid Range GW)-Pilot DI Module Resolved Channamallikarjuna Mattihalli

09/01/2026 21/01/2026 Actions
3028 Chola Turbo USB Factory Configuration Hold Greeshma Rayani

09/01/2026 20/01/2026 Actions
3027 Chola Turbo RTC BACKUP In Progress Channamallikarjuna Mattihalli

08/01/2026 20/01/2026 Actions
3026 mTracker(Mid Range GW)-Pilot GW2.0 Codebase readiness(Release 1.0) In Progress

09/01/2026 29/01/2026 Actions
3021 Chola Turbo E-REMOS device configuration & Dashboard setup Resolved Prakash M

07/01/2026 16/01/2026 Actions
3020 Chola Turbo Modbus mapping in Siemens PLC Resolved Prakash M

07/01/2026 09/01/2026 Actions
3019 mTracker(Mid Range GW)-Pilot IO PCB BoM Resolved Dhanasekar T

06/01/2026 06/01/2026 Actions
3018 Gateway V2 Review SW Development In Progress

Actions
3017 mTracker(Mid Range GW)-Pilot Design of Enclosure Graphics(Sticker/Screenprint) Resolved VenuMadhav S

06/01/2026 13/01/2026 Actions
3016 mTracker(Mid Range GW)-Pilot PCB Panel Design Resolved VenuMadhav S

06/01/2026 06/01/2026 Actions
3008 mDAQ4-1(Mid Range mDAQ)-Pilot Delivery (Pilot) New Dhanasekar T

08/05/2026 08/05/2026 Actions
3007 mDAQ4-1(Mid Range mDAQ)-Pilot Customer Demo New Venu Krishnamurthy

04/06/2026 05/06/2026 Actions
3006 mDAQ4-1(Mid Range mDAQ)-Pilot Hardware Readiness Resolved VenuMadhav S

30/04/2026 07/05/2026 Actions
3005 mDAQ4-1(Mid Range mDAQ)-Pilot System Testing New Jagatheswaran J

11/05/2026 25/05/2026 Actions
3004 mDAQ4-1(Mid Range mDAQ)-Pilot Testing In Progress VenuMadhav S

01/05/2026 03/06/2026 Actions
3003 mDAQ4-1(Mid Range mDAQ)-Pilot Mechanical Assembly Resolved Dhanasekar T

20/01/2026 27/01/2026 Actions
3000 mDAQ4-1(Mid Range mDAQ)-Pilot Assembly Manual (Documentation) In Progress VenuMadhav S

07/01/2026 14/01/2026 Actions